Orangery extensions in Purley: design, approvals and build
From the first sketch to final sign-off, we plan and build orangery extensions in Purley and the surrounding Greater London area.
- Guide price in PurleyFrom £39,000 inc VAT
- PlanningSame limits as single-storey rear; glazing checked for building regs
- Build time10–16 weeks on site
- Postcode districtsCR0, CR2, CR5, CR8, CR9

Local to Purley
Across CR0, CR2, CR5, CR8, CR9, SM6, we can visit, measure and advise. The same team covers Coulsdon (2 miles), South Croydon (2 miles), Wallington (3 miles), Carshalton (3 miles), all within easy reach.
Across London, terraced houses with narrow side returns and tight access are the norm, which shapes everything from party wall notices to how materials reach the back garden.
What is included
- Design of piers, roof perimeter and lantern proportions
- Opening into the main house
- Aluminium or timber lantern and full-height glazing
- Heating sized for the glass area
- Thermal calculations where glazing is generous
How much does an orangery extension cost in Purley?
Prices below are for Purley, using the London factor of ×1.3. They are guide ranges including VAT for the build only, not a quote.
Typical rates in Purley: £3,120 to £5,850 per m² including VAT, depending on specification.
| Size | Essential | Standard | Premium |
|---|---|---|---|
| 3 m × 4 m 12 m² | £39,000 – £47,500 | £43,500 – £55,000 | £53,000 – £70,500 |
| 4 m × 4 m 16 m² | £49,500 – £60,500 | £58,000 – £73,000 | £70,500 – £94,000 |
| 4 m × 6 m 24 m² | £74,500 – £90,500 | £87,000 – £109,500 | £106,000 – £140,500 |
Try the guide-price tool to see a range for your own size and finish.
Planning rules that apply in Purley
In England a glazed or orangery-style extension follows the same size limits as any single-storey rear extension: 3 m or 4 m without an application, or up to 6 m and 8 m through prior approval. Building regulations limit glazing to about a quarter of the new floor area plus the openings it replaces, unless whole-house calculations show the design still performs.
Before any drawing is finalised we check whether the house is listed, in a conservation area or subject to an Article 4 direction.
Building regulations approval is separate from planning. In England you can use the council's building control team or a registered building control approver; a full plans application gets the drawings checked before work starts, and the inspector signs the work off with a completion certificate.
If the work involves a shared wall, building on the boundary, or digging foundations within 3 m (sometimes 6 m) of a neighbour's building, the Party Wall etc. Act 1996 applies and notice must be served before work starts: two months for work to a party wall, one month for new walls on the boundary and for excavations.
Applications are decided by the local planning authority (your district, borough or unitary council).
Our process, step by step
Site visits are free and there is no obligation. Where drawings are needed, the design stage is priced in writing before it starts.
Free site visit
We visit your Purley home, measure up, talk through what you want and check the planning position.
Design and approvals
Drawings are prepared and agreed with you, then submitted for the right planning route and building regulations approval.
Fixed written price
We confirm the build price in writing, based on the approved drawings and the finishes you have chosen.
Build and sign-off
Our team builds the extension, keeps you updated weekly and finishes with building control sign-off.
Your questions about an orangery extension in Purley
Do you cover all of Purley?
Yes. We cover Purley and the surrounding parts of Greater London. Site visits are free and there is no obligation.
Will my neighbours in Purley be involved?
If a planning application or prior approval is needed, the council notifies neighbours. If the work is on or near a shared boundary, party wall notices may also be needed.
Do I need building regulations approval in Purley?
Yes. Almost every extension needs it, whatever the planning route. We prepare the drawings and book the inspections.
Will an orangery be too hot in summer?
Not if it is designed with solar-control glass, a solid perimeter and ventilation. We size the lantern and opening vents with that in mind.
Does an orangery need planning permission?
It follows the same size limits as other single-storey extensions. In England many fit within permitted development or prior approval; others need an application.
Book a free site visit in Purley
We will measure up, check the planning position and give you honest guide figures.
- Free, no-obligation site visit
- Planning route checked before you spend on drawings
- Written price once the design is agreed
- Building control sign-off at the end
Prefer to talk? Call 0800 088 6341 or .
Book a free site visit
Tell us a little about the project and we will arrange a time.