Orangery extensions for homes in Roehampton
Thinking about an orangery extension for your Roehampton home? Start with a free site visit: we measure up, check what the council will allow and give you honest guide figures on the day.
- Guide price in RoehamptonFrom £39,000 inc VAT
- PlanningSame limits as single-storey rear; glazing checked for building regs
- Build time10–16 weeks on site
- Postcode districtsSW13, SW14, SW15

What should I budget for an orangery extension in Roehampton?
For Roehampton we adjust our national guide rates by ×1.3, the factor we use for London. Figures include VAT; your written quote after the survey replaces them.
Typical rates in Roehampton: £3,120 to £5,850 per m² including VAT, depending on specification.
| Size | Essential | Standard | Premium |
|---|---|---|---|
| 3 m × 4 m 12 m² | £39,000 – £47,500 | £43,500 – £55,000 | £53,000 – £70,500 |
| 4 m × 4 m 16 m² | £49,500 – £60,500 | £58,000 – £73,000 | £70,500 – £94,000 |
| 4 m × 6 m 24 m² | £74,500 – £90,500 | £87,000 – £109,500 | £106,000 – £140,500 |
For a figure based on your own dimensions, use our guide-price tool.
What is included
- Thermal calculations where glazing is generous
- Foundations, walls and insulated perimeter roof
- Design of piers, roof perimeter and lantern proportions
- Heating sized for the glass area
- Aluminium or timber lantern and full-height glazing
Working in Roehampton
We cover Roehampton and the postcode districts SW13, SW14, SW15. Neighbouring towns we cover include Putney (1 mile), Barnes (2 miles), Wimbledon (3 miles), Earlsfield (3 miles).
For homes towards Surrey, East Molesey is around 6 miles away. London's housing is dominated by Victorian and Edwardian terraces, many with a rear outrigger and a side return, and 1930s semis in the outer boroughs. Conservation areas are common, so the planning check comes first.
Do I need planning permission in Roehampton?
In England a glazed or orangery-style extension follows the same size limits as any single-storey rear extension: 3 m or 4 m without an application, or up to 6 m and 8 m through prior approval. Building regulations limit glazing to about a quarter of the new floor area plus the openings it replaces, unless whole-house calculations show the design still performs.
In a conservation area, national park, National Landscape, the Broads or a World Heritage Site the permitted development limits are tighter (no side or two-storey extensions without an application). Listed homes need listed building consent, and if permitted development rights have been removed, any extension needs an application.
If the work involves a shared wall, building on the boundary, or digging foundations within 3 m (sometimes 6 m) of a neighbour's building, the Party Wall etc. Act 1996 applies and notice must be served before work starts: two months for work to a party wall, one month for new walls on the boundary and for excavations.
Building regulations approval is separate from planning. In England you can use the council's building control team or a registered building control approver; a full plans application gets the drawings checked before work starts, and the inspector signs the work off with a completion certificate.
Applications are decided by the local planning authority (your district, borough or unitary council).
Our process, step by step
Site visits are free and there is no obligation. Where drawings are needed, the design stage is priced in writing before it starts.
Free site visit
First, a site visit: we look at the house, garden, access and drains and listen to what you need.
Design and approvals
Once the layout is agreed, we deal with the council: planning permission or written confirmation that none is needed, plus building control.
Fixed written price
We confirm the build price in writing, based on the approved drawings and the finishes you have chosen.
Build and sign-off
We build it with one project manager, book the building control inspections and hand over the completion certificate.
Your questions about an orangery extension in Roehampton
Who do I contract with for an orangery extension in Roehampton?
Your contract is with S&K Property Investments and Improvement Ltd, which designs and manages the project and the build teams who carry it out.
Do I need building regulations approval in Roehampton?
Yes. Almost every extension needs it, whatever the planning route. We prepare the drawings and book the inspections.
Can I see a price before committing to anything?
Yes. The guide prices on this page are adjusted for Roehampton, and the guide-price tool gives a range for your own size. After the survey you get a written price before anything is agreed.
Will an orangery be too hot in summer?
Not if it is designed with solar-control glass, a solid perimeter and ventilation. We size the lantern and opening vents with that in mind.
Does an orangery need planning permission?
It follows the same size limits as other single-storey extensions. In England many fit within permitted development or prior approval; others need an application.
Book a free site visit in Roehampton
We will measure up, check the planning position and give you honest guide figures.
- Free, no-obligation site visit
- Planning route checked before you spend on drawings
- Written price once the design is agreed
- Building control sign-off at the end
Prefer to talk? Call 0800 088 6341 or .
Book a free site visit
Tell us a little about the project and we will arrange a time.