house-extension.uk

Building regulations for extensions across Roehampton

Need building regulations for extensions in Roehampton? We survey the house, prepare what the council needs and deal with the officers until a decision is made.

  • Guide price in RoehamptonFrom £1,150 inc VAT
  • Approval routeFull plans or building notice
  • Timescale2–5 weeks for drawings
  • Postcode districtsSW13, SW14, SW15
Builder installing a steel beam over a new rear opening on acrow props

What we take care of

  • Submission to the council or a registered building control approver
  • Completion certificate on sign-off
  • Inspection bookings throughout the build
  • Energy and glazing checks, including whole-house calculations if needed
  • Building regulations drawings and written specification
  • Structural calculations for beams, lintels and foundations

Extensions in and around Roehampton

We cover Roehampton and the postcode districts SW13, SW14, SW15. Neighbouring towns we cover include Putney (1 mile), Barnes (2 miles), Wimbledon (3 miles), Earlsfield (3 miles).

Just over the Surrey border, East Molesey is about 6 miles away. In London, space is at a premium and gardens are often short, so side returns, wraparounds and carefully planned rear extensions tend to make the most of every metre.

What it costs in Roehampton

Fees below are our Roehampton guide (×1.3, the London factor), including VAT. Council and building control fees are extra.

OptionWhat it coversGuide price
EssentialBuilding regulations drawings for a simple single-storey extension£1,150 – £2,350
StandardDrawings plus structural calculations£1,650 – £3,400
PremiumComplex or two-storey pack with energy calculations£2,850 – £4,950

Our design fee only. Building control charges are set by your council (or, in England and Wales, a registered building control approver) and quoted separately.

Try the guide-price tool to see a range for your own size and finish.

Planning rules that apply in Roehampton

Building regulations approval is separate from planning. In England you can use the council's building control team or a registered building control approver; a full plans application gets the drawings checked before work starts, and the inspector signs the work off with a completion certificate.

The planning position for a specific Roehampton address depends on its history and any designations, which is why we check it at the first visit.

If the work involves a shared wall, building on the boundary, or digging foundations within 3 m (sometimes 6 m) of a neighbour's building, the Party Wall etc. Act 1996 applies and notice must be served before work starts: two months for work to a party wall, one month for new walls on the boundary and for excavations.

Applications are decided by the local planning authority (your district, borough or unitary council).

How the project works

Site visits are free and there is no obligation. Where drawings are needed, the design stage is priced in writing before it starts.

  1. Free site visit

    It starts with a visit to your house to measure, check access and talk through ideas and budget.

  2. Design and approvals

    We draw the design, agree it with you and handle planning or permitted development checks and building regulations.

  3. Fixed written price

    You receive a written, itemised price and programme. Nothing starts until you are happy with it.

  4. Build and sign-off

    The build is managed from start to finish, inspected at each stage and signed off on completion.

Common questions in Roehampton

Can I see a price before committing to anything?

Yes. The guide prices on this page are adjusted for Roehampton, and the guide-price tool gives a range for your own size. After the survey you get a written price before anything is agreed.

Do you cover all of Roehampton?

Yes. We cover Roehampton and the surrounding parts of Greater London. Site visits are free and there is no obligation.

How long does this take for a Roehampton home?

2–5 weeks for drawings, depending on the council and the complexity of the project.

Who are building control?

Either your local council’s building control team or a registered building control approver. Both inspect the work and issue the completion certificate.

What are the insulation standards for an extension?

In England, new walls in an extension should achieve a U-value of 0.18 W/m²K, roofs 0.15 and floors 0.18, with windows at 1.4 and rooflights at 2.2. Wales, Scotland and Northern Ireland set their own figures.

Book a free site visit in Roehampton

We will measure up, check the planning position and give you honest guide figures.

  • Free, no-obligation site visit
  • Planning route checked before you spend on drawings
  • Written price once the design is agreed
  • Building control sign-off at the end

Prefer to talk? Call 0800 088 6341 or .

Book a free site visit

Tell us a little about the project and we will arrange a time.

Please enter a valid UK postcode.
Please choose an option.
Please enter your name.
Please enter a phone number.
Please enter a valid email.

We use your details only to reply to this enquiry and prepare your quote. Privacy notice.

Call usGet a quote