Orangery extensions in Bordon: design, approvals and build
We design and build orangery extensions for houses in Bordon, with a written price once the survey and design are done and one point of contact throughout.
- Guide price in BordonFrom £33,500 inc VAT
- PlanningSame limits as single-storey rear; glazing checked for building regs
- Build time10–16 weeks on site
- Postcode districtsGU35

Covering Bordon
Postcode districts we cover around Bordon include GU35. The same team covers Alton (5 miles), Aldershot (10 miles), Fleet (12 miles), Farnborough (13 miles), all within easy reach.
For homes towards Surrey, Farnham is around 7 miles away. The South East has a broad mix of 1930s semis, post-war estates, newer developments and period cottages, and many houses have enough garden for a generous rear extension.
What should I budget for an orangery extension in Bordon?
These guide figures apply our South East England adjustment (×1.12) to national rates. They include VAT at 20% and cover the build itself; design and council fees are listed separately.
Typical rates in Bordon: £2,690 to £5,040 per m² including VAT, depending on specification.
| Size | Essential | Standard | Premium |
|---|---|---|---|
| 3 m × 4 m 12 m² | £33,500 – £41,000 | £37,500 – £47,500 | £45,500 – £60,500 |
| 4 m × 4 m 16 m² | £43,000 – £52,000 | £50,000 – £63,000 | £60,500 – £81,000 |
| 4 m × 6 m 24 m² | £64,500 – £78,000 | £75,000 – £94,500 | £91,000 – £121,000 |
Want a range for your exact size? The guide-price tool takes about a minute.
What is included
- Heating sized for the glass area
- Thermal calculations where glazing is generous
- Foundations, walls and insulated perimeter roof
- Opening into the main house
- Aluminium or timber lantern and full-height glazing
- Design of piers, roof perimeter and lantern proportions
Planning and approvals in Bordon
In England a glazed or orangery-style extension follows the same size limits as any single-storey rear extension: 3 m or 4 m without an application, or up to 6 m and 8 m through prior approval. Building regulations limit glazing to about a quarter of the new floor area plus the openings it replaces, unless whole-house calculations show the design still performs.
In a conservation area, national park, National Landscape, the Broads or a World Heritage Site the permitted development limits are tighter (no side or two-storey extensions without an application). Listed homes need listed building consent, and if permitted development rights have been removed, any extension needs an application.
Building regulations approval is separate from planning. In England you can use the council's building control team or a registered building control approver; a full plans application gets the drawings checked before work starts, and the inspector signs the work off with a completion certificate.
Applications are decided by the local planning authority (your district, borough or unitary council).
What happens next
Site visits are free and there is no obligation. Where drawings are needed, the design stage is priced in writing before it starts.
Free site visit
A designer visits, takes measurements and photos, and discusses layouts, budget and timing with you.
Design and approvals
Once the layout is agreed, we deal with the council: planning permission or written confirmation that none is needed, plus building control.
Fixed written price
We confirm the build price in writing, based on the approved drawings and the finishes you have chosen.
Build and sign-off
Our team builds the extension, keeps you updated weekly and finishes with building control sign-off.
Orangery extension questions answered
Who do I contract with for an orangery extension in Bordon?
Your contract is with S&K Property Investments and Improvement Ltd, which designs and manages the project and the build teams who carry it out.
How long does an orangery extension take to build in Bordon?
On site, typically 10 to 16 weeks once approvals are in place. Before that, allow 6–12 weeks design and approvals.
Do you cover all of Bordon?
Yes. We cover Bordon and the surrounding parts of Hampshire. Site visits are free and there is no obligation.
What is the difference between an orangery and a conservatory?
An orangery has a solid roof perimeter with a central lantern and more solid wall, so it is warmer and more like a room. A conservatory is mostly glass. Building regulations treat a heated orangery joined to the house as an extension.
Does an orangery need planning permission?
It follows the same size limits as other single-storey extensions. In England many fit within permitted development or prior approval; others need an application.
Book a free site visit in Bordon
We will measure up, check the planning position and give you honest guide figures.
- Free, no-obligation site visit
- Planning route checked before you spend on drawings
- Written price once the design is agreed
- Building control sign-off at the end
Prefer to talk? Call 0800 088 6341 or .
Book a free site visit
Tell us a little about the project and we will arrange a time.