Orangery extensions in Bicester
Planning an orangery extension in Bicester? We survey the house, work out the planning route, draw the design and build it, so you deal with one team from the first visit to the completion certificate.
- Guide price in BicesterFrom £33,500 inc VAT
- PlanningSame limits as single-storey rear; glazing checked for building regs
- Build time10–16 weeks on site
- Postcode districtsOX6, OX25, OX26, OX27

Orangery extension prices in Bicester
Prices below are for Bicester, using the South East England factor of ×1.12. They are guide ranges including VAT for the build only, not a quote.
Typical rates in Bicester: £2,690 to £5,040 per m² including VAT, depending on specification.
| Size | Essential | Standard | Premium |
|---|---|---|---|
| 3 m × 4 m 12 m² | £33,500 – £41,000 | £37,500 – £47,500 | £45,500 – £60,500 |
| 4 m × 4 m 16 m² | £43,000 – £52,000 | £50,000 – £63,000 | £60,500 – £81,000 |
| 4 m × 6 m 24 m² | £64,500 – £78,000 | £75,000 – £94,500 | £91,000 – £121,000 |
Try the guide-price tool to see a range for your own size and finish.
Local to Bicester
We cover Bicester and the postcode districts OX6, OX25, OX26, OX27. Nearby, we also take on projects in Oxford (11 miles), Thame (13 miles), Banbury (14 miles), Witney (16 miles).
Homes across the South East range from Victorian terraces in the older town centres to large detached houses on the edges, so the right extension type varies street by street.
Planning and approvals in Bicester
In England a glazed or orangery-style extension follows the same size limits as any single-storey rear extension: 3 m or 4 m without an application, or up to 6 m and 8 m through prior approval. Building regulations limit glazing to about a quarter of the new floor area plus the openings it replaces, unless whole-house calculations show the design still performs.
Before any drawing is finalised we check whether the house is listed, in a conservation area or subject to an Article 4 direction.
Building regulations approval is separate from planning. In England you can use the council's building control team or a registered building control approver; a full plans application gets the drawings checked before work starts, and the inspector signs the work off with a completion certificate.
Applications are decided by the local planning authority (your district, borough or unitary council).
What is included
- Heating sized for the glass area
- Aluminium or timber lantern and full-height glazing
- Foundations, walls and insulated perimeter roof
- Opening into the main house
- Thermal calculations where glazing is generous
- Design of piers, roof perimeter and lantern proportions
The lantern-to-roof ratio sets the character. A wider solid perimeter gives a calmer, more room-like space and hides downlights and speakers; a bigger lantern feels brighter but needs more care against summer heat.
From first visit to completion
Site visits are free and there is no obligation. Where drawings are needed, the design stage is priced in writing before it starts.
Free site visit
We visit your Bicester home, measure up, talk through what you want and check the planning position.
Design and approvals
We draw the design, agree it with you and handle planning or permitted development checks and building regulations.
Fixed written price
With the design and specification agreed, you get a fixed written price and a start date.
Build and sign-off
Our team builds the extension, keeps you updated weekly and finishes with building control sign-off.
Questions people ask about orangery extensions
Do I need building regulations approval in Bicester?
Yes. Almost every extension needs it, whatever the planning route. We prepare the drawings and book the inspections.
Will my neighbours in Bicester be involved?
If a planning application or prior approval is needed, the council notifies neighbours. If the work is on or near a shared boundary, party wall notices may also be needed.
How long does an orangery extension take to build in Bicester?
On site, typically 10 to 16 weeks once approvals are in place. Before that, allow 6–12 weeks design and approvals.
Does an orangery need planning permission?
It follows the same size limits as other single-storey extensions. In England many fit within permitted development or prior approval; others need an application.
What is the difference between an orangery and a conservatory?
An orangery has a solid roof perimeter with a central lantern and more solid wall, so it is warmer and more like a room. A conservatory is mostly glass. Building regulations treat a heated orangery joined to the house as an extension.
Book a free site visit in Bicester
We will measure up, check the planning position and give you honest guide figures.
- Free, no-obligation site visit
- Planning route checked before you spend on drawings
- Written price once the design is agreed
- Building control sign-off at the end
Prefer to talk? Call 0800 088 6341 or .
Book a free site visit
Tell us a little about the project and we will arrange a time.