Bungalow extensions in Bicester

Bicester homeowners can use us for the whole bungalow extension project: survey, design, planning or permitted development checks, building regulations and the build itself.

  • Guide price in BicesterFrom £29,000 inc VAT
  • PlanningSingle storey often permitted development
  • Build time10–18 weeks on site
  • Postcode districtsOX6, OX25, OX26, OX27
Bungalow with a rear extension in matching brick and wide glazed doors

Working in Bicester

Our survey diary covers Bicester, including OX6, OX25, OX26, OX27. The same team covers Oxford (11 miles), Thame (13 miles), Banbury (14 miles), Witney (16 miles), all within easy reach.

The South East has a broad mix of 1930s semis, post-war estates, newer developments and period cottages, and many houses have enough garden for a generous rear extension.

Bungalow extension prices in Bicester

For Bicester we adjust our national guide rates by ×1.12, the factor we use for South East England. Figures include VAT; your written quote after the survey replaces them.

Typical rates in Bicester: £1,960 to £3,810 per m² including VAT, depending on specification.

SizeEssentialStandardPremium
3 m × 5 m
15 m²
£29,000 – £35,500£34,000 – £45,000£43,500 – £57,500
4 m × 6 m
24 m²
£47,000 – £56,500£55,000 – £71,500£69,500 – £91,500
L-shape
35 m²
£68,500 – £82,500£80,000 – £104,000£101,500 – £133,500

Want a range for your exact size? The guide-price tool takes about a minute.

What is included

  • Planning application where needed
  • Roof designs that tie into the existing hipped or gable roof
  • Level thresholds and accessible layouts
  • Structural survey before any upward extension

Planning rules that apply in Bicester

In England a single-storey extension to a bungalow follows the normal permitted development limits (3 m or 4 m, or 6 m and 8 m through prior approval). Adding a first floor always needs planning permission.

In a conservation area, national park, National Landscape, the Broads or a World Heritage Site the permitted development limits are tighter (no side or two-storey extensions without an application). Listed homes need listed building consent, and if permitted development rights have been removed, any extension needs an application.

If the work involves a shared wall, building on the boundary, or digging foundations within 3 m (sometimes 6 m) of a neighbour's building, the Party Wall etc. Act 1996 applies and notice must be served before work starts: two months for work to a party wall, one month for new walls on the boundary and for excavations.

Applications are decided by the local planning authority (your district, borough or unitary council).

How the project works

Site visits are free and there is no obligation. Where drawings are needed, the design stage is priced in writing before it starts.

  1. Free site visit

    We visit your Bicester home, measure up, talk through what you want and check the planning position.

  2. Design and approvals

    Once the layout is agreed, we deal with the council: planning permission or written confirmation that none is needed, plus building control.

  3. Fixed written price

    You receive a written, itemised price and programme. Nothing starts until you are happy with it.

  4. Build and sign-off

    The build is managed from start to finish, inspected at each stage and signed off on completion.

Common questions in Bicester

Can I see a price before committing to anything?

Yes. The guide prices on this page are adjusted for Bicester, and the guide-price tool gives a range for your own size. After the survey you get a written price before anything is agreed.

How long does a bungalow extension take to build in Bicester?

On site, typically 10 to 18 weeks once approvals are in place. Before that, allow 6–14 weeks design and approvals.

Will my neighbours in Bicester be involved?

If a planning application or prior approval is needed, the council notifies neighbours. If the work is on or near a shared boundary, party wall notices may also be needed.

How much does a bungalow extension cost?

Our guide range for single-storey work is about £1,960 to £3,810 per m² including VAT. Going upwards is priced after a structural survey.

Can I extend a bungalow without planning permission?

In England a single-storey rear extension to a bungalow follows the same permitted development limits as a house: 3 m or 4 m, or up to 6 m or 8 m through prior approval. Adding a storey always needs planning permission.

Book a free site visit in Bicester

We will measure up, check the planning position and give you honest guide figures.

  • Free, no-obligation site visit
  • Planning route checked before you spend on drawings
  • Written price once the design is agreed
  • Building control sign-off at the end

Prefer to talk? Call 0800 088 6341 or .

Book a free site visit

Tell us a little about the project and we will arrange a time.

Please enter a valid UK postcode.
Please choose an option.
Please enter your name.
Please enter a phone number.
Please enter a valid email.

We use your details only to reply to this enquiry and prepare your quote. Privacy notice.

Call usGet a quote