Kitchen extensions across West Midlands
Thinking about a kitchen extension for your West Midlands home? Start with a free site visit: we measure up, check what the council will allow and give you honest guide figures on the day.
- Guide priceFrom £26,000 inc VAT
- PlanningOften permitted development (3–4 m), or prior approval up to 6–8 m
- Towns covered20
- Site visitFree, no obligation

Towns in West Midlands
Working in West Midlands
Towns we cover in West Midlands include Birmingham, Coventry, Wolverhampton, Dudley, Walsall, Solihull, Sutton Coldfield, West Bromwich. The West Midlands has a large stock of 1930s and post-war semi-detached houses, which are well suited to rear, side and over-garage extensions, plus Victorian terraces in the older inner areas.
What we take care of
- Drainage and services designed for sinks, island and appliances
- Roof lantern or rooflights positioned over the work zones
- Kitchen-led layout planning before the drawings are fixed
- Kitchen fitting by our team or coordination with your supplier
- Wide sliding or bifold doors to the garden
- Extraction routes and ventilation for building regulations
What should I budget for a kitchen extension in West Midlands?
These guide figures apply our West Midlands adjustment (×0.97) to national rates. They include VAT at 20% and cover the build itself; design and council fees are listed separately.
Typical rates in West Midlands: £1,750 to £3,400 per m² including VAT, depending on specification.
| Size | Essential | Standard | Premium |
|---|---|---|---|
| 3 m × 5 m 15 m² | £26,000 – £31,000 | £30,500 – £39,000 | £38,500 – £51,000 |
| 4 m × 5 m 20 m² | £34,500 – £41,000 | £40,500 – £51,500 | £51,000 – £68,000 |
| 4 m × 7 m 28 m² | £48,500 – £57,500 | £57,000 – £72,000 | £71,500 – £95,500 |
Build cost only. A mid-range kitchen, supplied and fitted, typically adds £9,000 to £20,000.
Try the guide-price tool to see a range for your own size and finish.
Do I need planning permission in West Midlands?
In England a single-storey rear extension can usually go up to 3 m beyond the original rear wall of a semi-detached or terraced house, or 4 m on a detached house, without a planning application, provided it is no more than 4 m high, keeps eaves to 3 m within 2 m of a boundary and, with other buildings, covers no more than half the land around the original house. The larger home extension prior approval scheme raises those depths to 6 m and 8 m, with neighbours notified and a 42-day decision.
The planning position for a specific West Midlands address depends on its history and any designations, which is why we check it at the first visit.
If the work involves a shared wall, building on the boundary, or digging foundations within 3 m (sometimes 6 m) of a neighbour's building, the Party Wall etc. Act 1996 applies and notice must be served before work starts: two months for work to a party wall, one month for new walls on the boundary and for excavations.
Applications are decided by the local planning authority (your district, borough or unitary council).
From first visit to completion
Site visits are free and there is no obligation. Where drawings are needed, the design stage is priced in writing before it starts.
Free site visit
A designer visits, takes measurements and photos, and discusses layouts, budget and timing with you.
Design and approvals
We produce the drawings and structural design, and manage the approvals so they are in place before work starts.
Fixed written price
With the design and specification agreed, you get a fixed written price and a start date.
Build and sign-off
The build is managed from start to finish, inspected at each stage and signed off on completion.
Kitchen extension questions answered
Who do I contract with for a kitchen extension in West Midlands?
Your contract is with S&K Property Investments and Improvement Ltd, which designs and manages the project and the build teams who carry it out.
Do I need building regulations approval in West Midlands?
Yes. Almost every extension needs it, whatever the planning route. We prepare the drawings and book the inspections.
How long does a kitchen extension take to build in West Midlands?
On site, typically 10 to 16 weeks once approvals are in place. Before that, allow 4–12 weeks design and approvals.
Where should the island go?
Usually under the brightest part of the roof and away from the main walkway to the garden. We test two or three layouts on the plan before deciding.
Can you fit a kitchen I buy elsewhere?
Yes. We can fit it or work with your supplier’s fitters. We need the layout early so that drains, services and lighting are in the right place.
Book a free site visit in West Midlands
We will measure up, check the planning position and give you honest guide figures.
- Free, no-obligation site visit
- Planning route checked before you spend on drawings
- Written price once the design is agreed
- Building control sign-off at the end
Prefer to talk? Call 0800 088 6341 or .
Book a free site visit
Tell us a little about the project and we will arrange a time.