Kitchen extensions in Oakham: design, approvals and build
From the first sketch to final sign-off, we plan and build kitchen extensions in Oakham and the surrounding Rutland area.
- Guide price in OakhamFrom £25,500 inc VAT
- PlanningOften permitted development (3–4 m), or prior approval up to 6–8 m
- Build time10–16 weeks on site
- Postcode districtsLE15

What is included
- Wide sliding or bifold doors to the garden
- Kitchen-led layout planning before the drawings are fixed
- Extraction routes and ventilation for building regulations
- Drainage and services designed for sinks, island and appliances
- Roof lantern or rooflights positioned over the work zones
We start with the working triangle and the island, then set the doors, glazing and roof lights around it. Getting this order right avoids the classic mistakes: a sink against a blank wall, glare on the hob or a fridge blocking the garden view.
Guide prices for Oakham
Prices below are for Oakham, using the East Midlands factor of ×0.95. They are guide ranges including VAT for the build only, not a quote.
Typical rates in Oakham: £1,710 to £3,320 per m² including VAT, depending on specification.
| Size | Essential | Standard | Premium |
|---|---|---|---|
| 3 m × 5 m 15 m² | £25,500 – £30,000 | £29,500 – £38,000 | £37,500 – £50,000 |
| 4 m × 5 m 20 m² | £34,000 – £40,000 | £39,500 – £50,500 | £50,000 – £66,500 |
| 4 m × 7 m 28 m² | £47,500 – £56,000 | £55,500 – £70,500 | £70,000 – £93,500 |
Build cost only. A mid-range kitchen, supplied and fitted, typically adds £9,000 to £20,000.
Try the guide-price tool to see a range for your own size and finish.
Will the council need to approve it?
In England a single-storey rear extension can usually go up to 3 m beyond the original rear wall of a semi-detached or terraced house, or 4 m on a detached house, without a planning application, provided it is no more than 4 m high, keeps eaves to 3 m within 2 m of a boundary and, with other buildings, covers no more than half the land around the original house. The larger home extension prior approval scheme raises those depths to 6 m and 8 m, with neighbours notified and a 42-day decision.
The planning position for a specific Oakham address depends on its history and any designations, which is why we check it at the first visit.
If the work involves a shared wall, building on the boundary, or digging foundations within 3 m (sometimes 6 m) of a neighbour's building, the Party Wall etc. Act 1996 applies and notice must be served before work starts: two months for work to a party wall, one month for new walls on the boundary and for excavations.
Building regulations approval is separate from planning. In England you can use the council's building control team or a registered building control approver; a full plans application gets the drawings checked before work starts, and the inspector signs the work off with a completion certificate.
Applications are decided by the local planning authority (your district, borough or unitary council).
Local to Oakham
Site visits are available across Oakham (LE15). The same team covers Uppingham (0 miles), all within easy reach.
Just over the Lincolnshire border, Stamford is about 9 miles away. Homes across the East Midlands often have usable side land or a driveway beside the house, which opens up side and wraparound options.
From first visit to completion
Site visits are free and there is no obligation. Where drawings are needed, the design stage is priced in writing before it starts.
Free site visit
It starts with a visit to your house to measure, check access and talk through ideas and budget.
Design and approvals
Once the layout is agreed, we deal with the council: planning permission or written confirmation that none is needed, plus building control.
Fixed written price
We confirm the build price in writing, based on the approved drawings and the finishes you have chosen.
Build and sign-off
Our team builds the extension, keeps you updated weekly and finishes with building control sign-off.
Your questions about a kitchen extension in Oakham
Can I see a price before committing to anything?
Yes. The guide prices on this page are adjusted for Oakham, and the guide-price tool gives a range for your own size. After the survey you get a written price before anything is agreed.
How long does a kitchen extension take to build in Oakham?
On site, typically 10 to 16 weeks once approvals are in place. Before that, allow 4–12 weeks design and approvals.
Who do I contract with for a kitchen extension in Oakham?
Your contract is with S&K Property Investments and Improvement Ltd, which designs and manages the project and the build teams who carry it out.
How much does a kitchen extension cost?
For the extension itself our guide range is about £1,710 to £3,320 per m² including VAT. A standard 20 m² kitchen extension is typically around £39,500 to £50,500 in Oakham, plus the kitchen itself, which commonly adds £9,000 to £20,000 for a mid-range design.
Where should the island go?
Usually under the brightest part of the roof and away from the main walkway to the garden. We test two or three layouts on the plan before deciding.
Book a free site visit in Oakham
We will measure up, check the planning position and give you honest guide figures.
- Free, no-obligation site visit
- Planning route checked before you spend on drawings
- Written price once the design is agreed
- Building control sign-off at the end
Prefer to talk? Call 0800 088 6341 or .
Book a free site visit
Tell us a little about the project and we will arrange a time.