Single-storey rear extensions for homes in Oakham
Planning a single-storey extension in Oakham? We survey the house, work out the planning route, draw the design and build it, so you deal with one team from the first visit to the completion certificate.
- Guide price in OakhamFrom £19,500 inc VAT
- PlanningOften permitted development (3–4 m), or prior approval up to 6–8 m
- Build time10–16 weeks on site
- Postcode districtsLE15

Working in Oakham
Our survey diary covers Oakham, including LE15. The same team covers Uppingham (0 miles), all within easy reach.
For homes towards Lincolnshire, Stamford is around 9 miles away. Homes across the East Midlands often have usable side land or a driveway beside the house, which opens up side and wraparound options.
Is a single-storey extension right for your house?
- Semi-detached and detached houses with a usable rear garden
- Terraced houses that want a deeper kitchen across the full width
- Homeowners who want open-plan living onto the garden
Will the council need to approve it?
In England a single-storey rear extension can usually go up to 3 m beyond the original rear wall of a semi-detached or terraced house, or 4 m on a detached house, without a planning application, provided it is no more than 4 m high, keeps eaves to 3 m within 2 m of a boundary and, with other buildings, covers no more than half the land around the original house. The larger home extension prior approval scheme raises those depths to 6 m and 8 m, with neighbours notified and a 42-day decision.
Homes in conservation areas, national parks, National Landscapes (formerly AONBs), the Broads and World Heritage Sites have tighter rules, so we always check the property's status and planning history before design starts.
Building over or within 3 m of a public sewer needs the water company's consent, usually through a build-over agreement, before the foundations go in.
If the work involves a shared wall, building on the boundary, or digging foundations within 3 m (sometimes 6 m) of a neighbour's building, the Party Wall etc. Act 1996 applies and notice must be served before work starts: two months for work to a party wall, one month for new walls on the boundary and for excavations.
Applications are decided by the local planning authority (your district, borough or unitary council).
How much does a single-storey extension cost in Oakham?
Labour and material costs vary across the UK, so for Oakham we use our East Midlands factor (×0.95). The ranges include VAT and exclude design, structural and council fees.
Typical rates in Oakham: £1,660 to £3,230 per m² including VAT, depending on specification.
| Size | Essential | Standard | Premium |
|---|---|---|---|
| 3 m × 4 m 12 m² | £19,500 – £23,500 | £23,000 – £30,000 | £29,500 – £39,000 |
| 4 m × 5 m 20 m² | £33,000 – £39,000 | £38,500 – £49,500 | £49,000 – £65,000 |
| 5 m × 6 m 30 m² | £49,500 – £58,500 | £58,000 – £74,500 | £74,000 – £97,000 |
Want a range for your exact size? The guide-price tool takes about a minute.
Our process, step by step
Site visits are free and there is no obligation. Where drawings are needed, the design stage is priced in writing before it starts.
Free site visit
It starts with a visit to your house to measure, check access and talk through ideas and budget.
Design and approvals
We produce the drawings and structural design, and manage the approvals so they are in place before work starts.
Fixed written price
We confirm the build price in writing, based on the approved drawings and the finishes you have chosen.
Build and sign-off
Work is carried out to the agreed programme, inspected by building control and signed off at the end.
Your questions about a single-storey extension in Oakham
Do I need building regulations approval in Oakham?
Yes. Almost every extension needs it, whatever the planning route. We prepare the drawings and book the inspections.
Do you cover all of Oakham?
Yes. We cover Oakham and the surrounding parts of Rutland. Site visits are free and there is no obligation.
How long does a single-storey extension take to build in Oakham?
On site, typically 10 to 16 weeks once approvals are in place. Before that, allow 4–12 weeks design and approvals.
How much does a single-storey extension cost per square metre?
Our guide range is about £1,660 to £3,230 per m² including VAT, depending on specification. A standard-spec 4 m × 5 m room usually lands at £38,500 to £49,500 in Oakham, plus design and council fees.
Can I stay in the house during the build?
Usually yes. Most of the work happens outside until the final weeks, when we open the rear wall. We plan that stage carefully and seal the opening with a temporary screen to keep dust down.
Book a free site visit in Oakham
We will measure up, check the planning position and give you honest guide figures.
- Free, no-obligation site visit
- Planning route checked before you spend on drawings
- Written price once the design is agreed
- Building control sign-off at the end
Prefer to talk? Call 0800 088 6341 or .
Book a free site visit
Tell us a little about the project and we will arrange a time.