Kitchen extensions for homes in Leatherhead
Our design and build teams take on kitchen extensions in Leatherhead, from the first measured survey through planning and building control to the finished room.
- Guide price in LeatherheadFrom £30,000 inc VAT
- PlanningOften permitted development (3–4 m), or prior approval up to 6–8 m
- Build time10–16 weeks on site
- Postcode districtsKT21, KT22, KT23

What should I budget for a kitchen extension in Leatherhead?
Labour and material costs vary across the UK, so for Leatherhead we use our South East England factor (×1.12). The ranges include VAT and exclude design, structural and council fees.
Typical rates in Leatherhead: £2,020 to £3,920 per m² including VAT, depending on specification.
| Size | Essential | Standard | Premium |
|---|---|---|---|
| 3 m × 5 m 15 m² | £30,000 – £35,500 | £35,000 – £45,000 | £44,500 – £59,000 |
| 4 m × 5 m 20 m² | £40,000 – £47,500 | £47,000 – £59,500 | £59,000 – £78,500 |
| 4 m × 7 m 28 m² | £56,000 – £66,000 | £65,500 – £83,500 | £83,000 – £110,000 |
Build cost only. A mid-range kitchen, supplied and fitted, typically adds £9,000 to £20,000.
For a figure based on your own dimensions, use our guide-price tool.
Planning rules that apply in Leatherhead
In England a single-storey rear extension can usually go up to 3 m beyond the original rear wall of a semi-detached or terraced house, or 4 m on a detached house, without a planning application, provided it is no more than 4 m high, keeps eaves to 3 m within 2 m of a boundary and, with other buildings, covers no more than half the land around the original house. The larger home extension prior approval scheme raises those depths to 6 m and 8 m, with neighbours notified and a 42-day decision.
Homes in conservation areas, national parks, National Landscapes (formerly AONBs), the Broads and World Heritage Sites have tighter rules, so we always check the property's status and planning history before design starts.
Building regulations approval is separate from planning. In England you can use the council's building control team or a registered building control approver; a full plans application gets the drawings checked before work starts, and the inspector signs the work off with a completion certificate.
If the work involves a shared wall, building on the boundary, or digging foundations within 3 m (sometimes 6 m) of a neighbour's building, the Party Wall etc. Act 1996 applies and notice must be served before work starts: two months for work to a party wall, one month for new walls on the boundary and for excavations.
Applications are decided by the local planning authority (your district, borough or unitary council).
Included in a typical project
- Wide sliding or bifold doors to the garden
- Extraction routes and ventilation for building regulations
- Kitchen fitting by our team or coordination with your supplier
- Kitchen-led layout planning before the drawings are fixed
- Drainage and services designed for sinks, island and appliances
Extensions in and around Leatherhead
Postcode districts we cover around Leatherhead include KT21, KT22, KT23. Nearby, we also take on projects in Epsom (4 miles), Ewell (5 miles), Esher (5 miles), Banstead (6 miles).
Chessington, in Greater London, is roughly 5 miles from Leatherhead and also on our list. Homes across the South East range from Victorian terraces in the older town centres to large detached houses on the edges, so the right extension type varies street by street.
How the project works
Site visits are free and there is no obligation. Where drawings are needed, the design stage is priced in writing before it starts.
Free site visit
A designer visits, takes measurements and photos, and discusses layouts, budget and timing with you.
Design and approvals
Drawings are prepared and agreed with you, then submitted for the right planning route and building regulations approval.
Fixed written price
With the design and specification agreed, you get a fixed written price and a start date.
Build and sign-off
The build is managed from start to finish, inspected at each stage and signed off on completion.
Common questions in Leatherhead
How long does a kitchen extension take to build in Leatherhead?
On site, typically 10 to 16 weeks once approvals are in place. Before that, allow 4–12 weeks design and approvals.
Do I need building regulations approval in Leatherhead?
Yes. Almost every extension needs it, whatever the planning route. We prepare the drawings and book the inspections.
Can I see a price before committing to anything?
Yes. The guide prices on this page are adjusted for Leatherhead, and the guide-price tool gives a range for your own size. After the survey you get a written price before anything is agreed.
How much does a kitchen extension cost?
For the extension itself our guide range is about £2,020 to £3,920 per m² including VAT. A standard 20 m² kitchen extension is typically around £47,000 to £59,500 in Leatherhead, plus the kitchen itself, which commonly adds £9,000 to £20,000 for a mid-range design.
Where should the island go?
Usually under the brightest part of the roof and away from the main walkway to the garden. We test two or three layouts on the plan before deciding.
Book a free site visit in Leatherhead
We will measure up, check the planning position and give you honest guide figures.
- Free, no-obligation site visit
- Planning route checked before you spend on drawings
- Written price once the design is agreed
- Building control sign-off at the end
Prefer to talk? Call 0800 088 6341 or .
Book a free site visit
Tell us a little about the project and we will arrange a time.