house-extension.uk

Kitchen extensions in Bury

If you live in Bury and want more space without moving, a kitchen extension is one of the most practical ways to get it. We handle the drawings, approvals and the build.

  • Guide price in BuryFrom £25,500 inc VAT
  • PlanningOften permitted development (3–4 m), or prior approval up to 6–8 m
  • Build time10–16 weeks on site
  • Postcode districtsBL0, BL8, BL9, M26, OL10
Kitchen extension with a navy island, flat rooflights and sliding doors to the garden

What should I budget for a kitchen extension in Bury?

These guide figures apply our North West England adjustment (×0.95) to national rates. They include VAT at 20% and cover the build itself; design and council fees are listed separately.

Typical rates in Bury: £1,710 to £3,320 per m² including VAT, depending on specification.

SizeEssentialStandardPremium
3 m × 5 m
15 m²
£25,500 – £30,000£29,500 – £38,000£37,500 – £50,000
4 m × 5 m
20 m²
£34,000 – £40,000£39,500 – £50,500£50,000 – £66,500
4 m × 7 m
28 m²
£47,500 – £56,000£55,500 – £70,500£70,000 – £93,500

Build cost only. A mid-range kitchen, supplied and fitted, typically adds £9,000 to £20,000.

Try the guide-price tool to see a range for your own size and finish.

Working in Bury

Site visits are available across Bury (BL0, BL8, BL9, M26, OL10). Neighbouring towns we cover include Radcliffe (3 miles), Heywood (3 miles), Whitefield (3 miles), Prestwich (5 miles).

For homes towards Lancashire, Rawtenstall is around 7 miles away. Across the North West, terraced houses with small rear yards suit compact rear and side return extensions, while suburban semis have room for more.

Do I need planning permission in Bury?

In England a single-storey rear extension can usually go up to 3 m beyond the original rear wall of a semi-detached or terraced house, or 4 m on a detached house, without a planning application, provided it is no more than 4 m high, keeps eaves to 3 m within 2 m of a boundary and, with other buildings, covers no more than half the land around the original house. The larger home extension prior approval scheme raises those depths to 6 m and 8 m, with neighbours notified and a 42-day decision.

Homes in conservation areas, national parks, National Landscapes (formerly AONBs), the Broads and World Heritage Sites have tighter rules, so we always check the property's status and planning history before design starts.

Building over or within 3 m of a public sewer needs the water company's consent, usually through a build-over agreement, before the foundations go in.

Building regulations approval is separate from planning. In England you can use the council's building control team or a registered building control approver; a full plans application gets the drawings checked before work starts, and the inspector signs the work off with a completion certificate.

Applications are decided by the local planning authority (your district, borough or unitary council).

When a kitchen extension makes sense

  • Small or closed-off kitchens
  • Families who want cooking, dining and living together
  • Homes being prepared for sale or a long-term stay

From first visit to completion

Site visits are free and there is no obligation. Where drawings are needed, the design stage is priced in writing before it starts.

  1. Free site visit

    A designer visits, takes measurements and photos, and discusses layouts, budget and timing with you.

  2. Design and approvals

    Once the layout is agreed, we deal with the council: planning permission or written confirmation that none is needed, plus building control.

  3. Fixed written price

    The price is fixed in writing once the design is settled, with a clear programme and payment stages.

  4. Build and sign-off

    We build it with one project manager, book the building control inspections and hand over the completion certificate.

Your questions about a kitchen extension in Bury

Do I need building regulations approval in Bury?

Yes. Almost every extension needs it, whatever the planning route. We prepare the drawings and book the inspections.

Can I see a price before committing to anything?

Yes. The guide prices on this page are adjusted for Bury, and the guide-price tool gives a range for your own size. After the survey you get a written price before anything is agreed.

How long does a kitchen extension take to build in Bury?

On site, typically 10 to 16 weeks once approvals are in place. Before that, allow 4–12 weeks design and approvals.

Can you fit a kitchen I buy elsewhere?

Yes. We can fit it or work with your supplier’s fitters. We need the layout early so that drains, services and lighting are in the right place.

Where should the island go?

Usually under the brightest part of the roof and away from the main walkway to the garden. We test two or three layouts on the plan before deciding.

Book a free site visit in Bury

We will measure up, check the planning position and give you honest guide figures.

  • Free, no-obligation site visit
  • Planning route checked before you spend on drawings
  • Written price once the design is agreed
  • Building control sign-off at the end

Prefer to talk? Call 0800 088 6341 or .

Book a free site visit

Tell us a little about the project and we will arrange a time.

Please enter a valid UK postcode.
Please choose an option.
Please enter your name.
Please enter a phone number.
Please enter a valid email.

We use your details only to reply to this enquiry and prepare your quote. Privacy notice.

Call usGet a quote