Home office extensions in Eastleigh

We design and build home office extensions for houses in Eastleigh, with a written price once the survey and design are done and one point of contact throughout.

  • Guide price in EastleighFrom £17,500 inc VAT
  • PlanningOften permitted development (3–4 m), or prior approval up to 6–8 m
  • Build time8–12 weeks on site
  • Postcode districtsSO18, SO50, SO53
Home office extension with a desk facing a large garden window and a rooflight

Working in Eastleigh

Our survey diary covers Eastleigh, including SO18, SO50, SO53. Nearby, we also take on projects in Southampton (5 miles), Winchester (7 miles), Totton (7 miles), Hythe (8 miles).

The South East has a broad mix of 1930s semis, post-war estates, newer developments and period cottages, and many houses have enough garden for a generous rear extension.

How much does a home office extension cost in Eastleigh?

These guide figures apply our South East England adjustment (×1.12) to national rates. They include VAT at 20% and cover the build itself; design and council fees are listed separately.

Typical rates in Eastleigh: £2,070 to £3,810 per m² including VAT, depending on specification.

SizeEssentialStandardPremium
2.5 m × 3.2 m
8 m²
£17,500 – £21,500£19,000 – £24,500£24,000 – £30,500
3 m × 3.6 m
11 m²
£22,500 – £27,500£26,000 – £33,500£33,000 – £42,000
3 m × 5 m
15 m²
£31,000 – £37,000£36,000 – £45,500£45,000 – £57,500

Want a range for your exact size? The guide-price tool takes about a minute.

Do I need planning permission in Eastleigh?

In England a single-storey rear extension can usually go up to 3 m beyond the original rear wall of a semi-detached or terraced house, or 4 m on a detached house, without a planning application, provided it is no more than 4 m high, keeps eaves to 3 m within 2 m of a boundary and, with other buildings, covers no more than half the land around the original house. The larger home extension prior approval scheme raises those depths to 6 m and 8 m, with neighbours notified and a 42-day decision.

In a conservation area, national park, National Landscape, the Broads or a World Heritage Site the permitted development limits are tighter (no side or two-storey extensions without an application). Listed homes need listed building consent, and if permitted development rights have been removed, any extension needs an application.

Building over or within 3 m of a public sewer needs the water company's consent, usually through a build-over agreement, before the foundations go in.

Applications are decided by the local planning authority (your district, borough or unitary council).

What we take care of

  • Heating or cooling sized for the room
  • Data cabling and plenty of sockets
  • Layout for desk, storage and video calls
  • Sound insulation to the adjoining rooms

From first visit to completion

Site visits are free and there is no obligation. Where drawings are needed, the design stage is priced in writing before it starts.

  1. Free site visit

    First, a site visit: we look at the house, garden, access and drains and listen to what you need.

  2. Design and approvals

    Drawings are prepared and agreed with you, then submitted for the right planning route and building regulations approval.

  3. Fixed written price

    The price is fixed in writing once the design is settled, with a clear programme and payment stages.

  4. Build and sign-off

    Our team builds the extension, keeps you updated weekly and finishes with building control sign-off.

Home office extension questions answered

Do you cover all of Eastleigh?

Yes. We cover Eastleigh and the surrounding parts of Hampshire. Site visits are free and there is no obligation.

Who do I contract with for a home office extension in Eastleigh?

Your contract is with S&K Property Investments and Improvement Ltd, which designs and manages the project and the build teams who carry it out.

How long does a home office extension take to build in Eastleigh?

On site, typically 8 to 12 weeks once approvals are in place. Before that, allow 4–10 weeks design and approvals.

Can I claim the cost against tax?

Building work on your home is not normally an allowable business expense, and claiming it can have capital gains tax effects. Speak to an accountant before assuming any tax relief.

Is an attached office better than a garden office?

An attached office shares the house heating and broadband, adds floor area to the home, and needs no garden path in the rain. A garden building can be cheaper and quicker but is a separate structure.

Book a free site visit in Eastleigh

We will measure up, check the planning position and give you honest guide figures.

  • Free, no-obligation site visit
  • Planning route checked before you spend on drawings
  • Written price once the design is agreed
  • Building control sign-off at the end

Prefer to talk? Call 0800 088 6341 or .

Book a free site visit

Tell us a little about the project and we will arrange a time.

Please enter a valid UK postcode.
Please choose an option.
Please enter your name.
Please enter a phone number.
Please enter a valid email.

We use your details only to reply to this enquiry and prepare your quote. Privacy notice.

Call usGet a quote