Eastleigh kitchen extensions, designed and built
A kitchen extension in Eastleigh starts with the right design and the right approval route. We take care of both, then build it with our own project management.
- Guide price in EastleighFrom £30,000 inc VAT
- PlanningOften permitted development (3–4 m), or prior approval up to 6–8 m
- Build time10–16 weeks on site
- Postcode districtsSO18, SO50, SO53

Planning rules that apply in Eastleigh
In England a single-storey rear extension can usually go up to 3 m beyond the original rear wall of a semi-detached or terraced house, or 4 m on a detached house, without a planning application, provided it is no more than 4 m high, keeps eaves to 3 m within 2 m of a boundary and, with other buildings, covers no more than half the land around the original house. The larger home extension prior approval scheme raises those depths to 6 m and 8 m, with neighbours notified and a 42-day decision.
Homes in conservation areas, national parks, National Landscapes (formerly AONBs), the Broads and World Heritage Sites have tighter rules, so we always check the property's status and planning history before design starts.
Building over or within 3 m of a public sewer needs the water company's consent, usually through a build-over agreement, before the foundations go in.
If the work involves a shared wall, building on the boundary, or digging foundations within 3 m (sometimes 6 m) of a neighbour's building, the Party Wall etc. Act 1996 applies and notice must be served before work starts: two months for work to a party wall, one month for new walls on the boundary and for excavations.
Applications are decided by the local planning authority (your district, borough or unitary council).
Guide prices for Eastleigh
Prices below are for Eastleigh, using the South East England factor of ×1.12. They are guide ranges including VAT for the build only, not a quote.
Typical rates in Eastleigh: £2,020 to £3,920 per m² including VAT, depending on specification.
| Size | Essential | Standard | Premium |
|---|---|---|---|
| 3 m × 5 m 15 m² | £30,000 – £35,500 | £35,000 – £45,000 | £44,500 – £59,000 |
| 4 m × 5 m 20 m² | £40,000 – £47,500 | £47,000 – £59,500 | £59,000 – £78,500 |
| 4 m × 7 m 28 m² | £56,000 – £66,000 | £65,500 – £83,500 | £83,000 – £110,000 |
Build cost only. A mid-range kitchen, supplied and fitted, typically adds £9,000 to £20,000.
For a figure based on your own dimensions, use our guide-price tool.
Covering Eastleigh
Site visits are available across Eastleigh (SO18, SO50, SO53). Nearby, we also take on projects in Southampton (5 miles), Winchester (7 miles), Totton (7 miles), Hythe (8 miles).
Cowes, in Isle of Wight, is roughly 14 miles from Eastleigh and also on our list. In the South East, plenty of houses have already been extended once, which makes checking the remaining permitted development allowance an important early step.
What is included
- Roof lantern or rooflights positioned over the work zones
- Kitchen fitting by our team or coordination with your supplier
- Kitchen-led layout planning before the drawings are fixed
- Extraction routes and ventilation for building regulations
From first visit to completion
Site visits are free and there is no obligation. Where drawings are needed, the design stage is priced in writing before it starts.
Free site visit
We visit your Eastleigh home, measure up, talk through what you want and check the planning position.
Design and approvals
Once the layout is agreed, we deal with the council: planning permission or written confirmation that none is needed, plus building control.
Fixed written price
The price is fixed in writing once the design is settled, with a clear programme and payment stages.
Build and sign-off
The build is managed from start to finish, inspected at each stage and signed off on completion.
Common questions in Eastleigh
Can I see a price before committing to anything?
Yes. The guide prices on this page are adjusted for Eastleigh, and the guide-price tool gives a range for your own size. After the survey you get a written price before anything is agreed.
How long does a kitchen extension take to build in Eastleigh?
On site, typically 10 to 16 weeks once approvals are in place. Before that, allow 4–12 weeks design and approvals.
Do I need building regulations approval in Eastleigh?
Yes. Almost every extension needs it, whatever the planning route. We prepare the drawings and book the inspections.
Can you fit a kitchen I buy elsewhere?
Yes. We can fit it or work with your supplier’s fitters. We need the layout early so that drains, services and lighting are in the right place.
Where should the island go?
Usually under the brightest part of the roof and away from the main walkway to the garden. We test two or three layouts on the plan before deciding.
Book a free site visit in Eastleigh
We will measure up, check the planning position and give you honest guide figures.
- Free, no-obligation site visit
- Planning route checked before you spend on drawings
- Written price once the design is agreed
- Building control sign-off at the end
Prefer to talk? Call 0800 088 6341 or .
Book a free site visit
Tell us a little about the project and we will arrange a time.