Derby home office extensions, designed and built
Derby homeowners can use us for the whole home office extension project: survey, design, planning or permitted development checks, building regulations and the build itself.
- Guide price in DerbyFrom £15,000 inc VAT
- PlanningOften permitted development (3–4 m), or prior approval up to 6–8 m
- Build time8–12 weeks on site
- Postcode districtsDE1, DE3, DE21, DE22, DE23

Included in a typical project
- Layout for desk, storage and video calls
- Window and rooflight placement to avoid screen glare
- Data cabling and plenty of sockets
- Heating or cooling sized for the room
Covering Derby
Our survey diary covers Derby, including DE1, DE3, DE21, DE22, DE23, DE24. The same team covers Belper (7 miles), Ilkeston (8 miles), Heanor (8 miles), Ripley (8 miles), all within easy reach.
For homes towards Nottinghamshire, Eastwood is around 9 miles away. Homes across the East Midlands often have usable side land or a driveway beside the house, which opens up side and wraparound options.
How much does a home office extension cost in Derby?
For Derby we adjust our national guide rates by ×0.95, the factor we use for East Midlands. Figures include VAT; your written quote after the survey replaces them.
Typical rates in Derby: £1,760 to £3,230 per m² including VAT, depending on specification.
| Size | Essential | Standard | Premium |
|---|---|---|---|
| 2.5 m × 3.2 m 8 m² | £15,000 – £18,500 | £16,000 – £21,000 | £20,500 – £26,000 |
| 3 m × 3.6 m 11 m² | £19,000 – £23,000 | £22,000 – £28,500 | £28,000 – £36,000 |
| 3 m × 5 m 15 m² | £26,000 – £31,500 | £30,500 – £38,500 | £38,000 – £48,500 |
For a figure based on your own dimensions, use our guide-price tool.
Planning rules that apply in Derby
In England a single-storey rear extension can usually go up to 3 m beyond the original rear wall of a semi-detached or terraced house, or 4 m on a detached house, without a planning application, provided it is no more than 4 m high, keeps eaves to 3 m within 2 m of a boundary and, with other buildings, covers no more than half the land around the original house. The larger home extension prior approval scheme raises those depths to 6 m and 8 m, with neighbours notified and a 42-day decision.
Before any drawing is finalised we check whether the house is listed, in a conservation area or subject to an Article 4 direction.
Building regulations approval is separate from planning. In England you can use the council's building control team or a registered building control approver; a full plans application gets the drawings checked before work starts, and the inspector signs the work off with a completion certificate.
If the work involves a shared wall, building on the boundary, or digging foundations within 3 m (sometimes 6 m) of a neighbour's building, the Party Wall etc. Act 1996 applies and notice must be served before work starts: two months for work to a party wall, one month for new walls on the boundary and for excavations.
Applications are decided by the local planning authority (your district, borough or unitary council).
From first visit to completion
Site visits are free and there is no obligation. Where drawings are needed, the design stage is priced in writing before it starts.
Free site visit
It starts with a visit to your house to measure, check access and talk through ideas and budget.
Design and approvals
We draw the design, agree it with you and handle planning or permitted development checks and building regulations.
Fixed written price
With the design and specification agreed, you get a fixed written price and a start date.
Build and sign-off
Work is carried out to the agreed programme, inspected by building control and signed off at the end.
Your questions about a home office extension in Derby
Will my neighbours in Derby be involved?
If a planning application or prior approval is needed, the council notifies neighbours. If the work is on or near a shared boundary, party wall notices may also be needed.
Do you cover all of Derby?
Yes. We cover Derby and the surrounding parts of Derbyshire. Site visits are free and there is no obligation.
How long does a home office extension take to build in Derby?
On site, typically 8 to 12 weeks once approvals are in place. Before that, allow 4–10 weeks design and approvals.
Is an attached office better than a garden office?
An attached office shares the house heating and broadband, adds floor area to the home, and needs no garden path in the rain. A garden building can be cheaper and quicker but is a separate structure.
Can I claim the cost against tax?
Building work on your home is not normally an allowable business expense, and claiming it can have capital gains tax effects. Speak to an accountant before assuming any tax relief.
Book a free site visit in Derby
We will measure up, check the planning position and give you honest guide figures.
- Free, no-obligation site visit
- Planning route checked before you spend on drawings
- Written price once the design is agreed
- Building control sign-off at the end
Prefer to talk? Call 0800 088 6341 or .
Book a free site visit
Tell us a little about the project and we will arrange a time.