Flat roof extensions in Yeadon
If you live in Yeadon and want more space without moving, a flat roof extension is one of the most practical ways to get it. We handle the drawings, approvals and the build.
- Guide price in YeadonFrom £19,500 inc VAT
- PlanningOften permitted development (3–4 m), or prior approval up to 6–8 m
- Build time10–16 weeks on site
- Postcode districtsBD10, LS18, LS19, LS20

What should I budget for a flat roof extension in Yeadon?
Prices below are for Yeadon, using the Yorkshire and the Humber factor of ×0.94. They are guide ranges including VAT for the build only, not a quote.
Typical rates in Yeadon: £1,640 to £3,150 per m² including VAT, depending on specification.
| Size | Essential | Standard | Premium |
|---|---|---|---|
| 3 m × 4 m 12 m² | £19,500 – £23,500 | £23,000 – £29,500 | £29,000 – £38,000 |
| 4 m × 5 m 20 m² | £32,500 – £39,000 | £38,500 – £49,000 | £48,500 – £63,000 |
| 5 m × 6 m 30 m² | £49,000 – £58,000 | £57,500 – £73,500 | £73,000 – £94,500 |
Want a range for your exact size? The guide-price tool takes about a minute.
Working in Yeadon
Site visits are available across Yeadon (BD10, LS18, LS19, LS20). Nearby, we also take on projects in Guiseley (1 mile), Horsforth (3 miles), Shipley (4 miles), Pudsey (5 miles).
Just over the North Yorkshire border, Harrogate is about 11 miles away. Homes across Yorkshire and the Humber range from back-to-back and through terraces to large suburban semis, and extension options vary with them.
Will the council need to approve it?
In England a single-storey rear extension can usually go up to 3 m beyond the original rear wall of a semi-detached or terraced house, or 4 m on a detached house, without a planning application, provided it is no more than 4 m high, keeps eaves to 3 m within 2 m of a boundary and, with other buildings, covers no more than half the land around the original house. The larger home extension prior approval scheme raises those depths to 6 m and 8 m, with neighbours notified and a 42-day decision.
The planning position for a specific Yeadon address depends on its history and any designations, which is why we check it at the first visit.
Building regulations approval is separate from planning. In England you can use the council's building control team or a registered building control approver; a full plans application gets the drawings checked before work starts, and the inspector signs the work off with a completion certificate.
Building over or within 3 m of a public sewer needs the water company's consent, usually through a build-over agreement, before the foundations go in.
Applications are decided by the local planning authority (your district, borough or unitary council).
What is included
- Membrane choice: single-ply, EPDM or GRP
- Lanterns or rooflights with upstands
- Falls and outlets designed to drain properly
- Warm-roof design with insulation above the deck
- Parapets or edge trims and flashings to the house
From first visit to completion
Site visits are free and there is no obligation. Where drawings are needed, the design stage is priced in writing before it starts.
Free site visit
It starts with a visit to your house to measure, check access and talk through ideas and budget.
Design and approvals
We produce the drawings and structural design, and manage the approvals so they are in place before work starts.
Fixed written price
The price is fixed in writing once the design is settled, with a clear programme and payment stages.
Build and sign-off
The build is managed from start to finish, inspected at each stage and signed off on completion.
Common questions in Yeadon
Do you cover all of Yeadon?
Yes. We cover Yeadon and the surrounding parts of West Yorkshire. Site visits are free and there is no obligation.
Who do I contract with for a flat roof extension in Yeadon?
Your contract is with S&K Property Investments and Improvement Ltd, which designs and manages the project and the build teams who carry it out.
How long does a flat roof extension take to build in Yeadon?
On site, typically 10 to 16 weeks once approvals are in place. Before that, allow 4–12 weeks design and approvals.
Are flat roof extensions cheaper?
Usually slightly, because there is less roof structure and no tiles. Our guide range is about £1,640 to £3,150 per m² including VAT.
Can I walk on a flat roof extension?
Only for maintenance unless it is designed as a terrace. A roof terrace or balcony needs planning permission and a different structure.
Book a free site visit in Yeadon
We will measure up, check the planning position and give you honest guide figures.
- Free, no-obligation site visit
- Planning route checked before you spend on drawings
- Written price once the design is agreed
- Building control sign-off at the end
Prefer to talk? Call 0800 088 6341 or .
Book a free site visit
Tell us a little about the project and we will arrange a time.