Flat roof extensions in Sandhurst
We design and build flat roof extensions for houses in Sandhurst, with a written price once the survey and design are done and one point of contact throughout.
- Guide price in SandhurstFrom £23,500 inc VAT
- PlanningOften permitted development (3–4 m), or prior approval up to 6–8 m
- Build time10–16 weeks on site
- Postcode districtsGU47, RG45

Working in Sandhurst
Our survey diary covers Sandhurst, including GU47, RG45. We also work in nearby Crowthorne (2 miles), Bracknell (5 miles), Wokingham (5 miles), Earley (8 miles).
Just over the Hampshire border, Yateley is about 2 miles away. In the South East, plenty of houses have already been extended once, which makes checking the remaining permitted development allowance an important early step.
Guide prices for Sandhurst
For Sandhurst we adjust our national guide rates by ×1.12, the factor we use for South East England. Figures include VAT; your written quote after the survey replaces them.
Typical rates in Sandhurst: £1,960 to £3,750 per m² including VAT, depending on specification.
| Size | Essential | Standard | Premium |
|---|---|---|---|
| 3 m × 4 m 12 m² | £23,500 – £28,000 | £27,500 – £35,000 | £34,500 – £45,500 |
| 4 m × 5 m 20 m² | £39,000 – £46,000 | £45,500 – £58,500 | £58,000 – £75,500 |
| 5 m × 6 m 30 m² | £58,500 – £69,000 | £68,500 – £87,500 | £87,000 – £113,000 |
Want a range for your exact size? The guide-price tool takes about a minute.
Will the council need to approve it?
In England a single-storey rear extension can usually go up to 3 m beyond the original rear wall of a semi-detached or terraced house, or 4 m on a detached house, without a planning application, provided it is no more than 4 m high, keeps eaves to 3 m within 2 m of a boundary and, with other buildings, covers no more than half the land around the original house. The larger home extension prior approval scheme raises those depths to 6 m and 8 m, with neighbours notified and a 42-day decision.
In a conservation area, national park, National Landscape, the Broads or a World Heritage Site the permitted development limits are tighter (no side or two-storey extensions without an application). Listed homes need listed building consent, and if permitted development rights have been removed, any extension needs an application.
Building regulations approval is separate from planning. In England you can use the council's building control team or a registered building control approver; a full plans application gets the drawings checked before work starts, and the inspector signs the work off with a completion certificate.
If the work involves a shared wall, building on the boundary, or digging foundations within 3 m (sometimes 6 m) of a neighbour's building, the Party Wall etc. Act 1996 applies and notice must be served before work starts: two months for work to a party wall, one month for new walls on the boundary and for excavations.
Applications are decided by the local planning authority (your district, borough or unitary council).
Who a flat roof extension suits
- Modern and 1930s onwards houses
- Homeowners who want maximum light from above
- Extensions under first-floor windows where a pitch will not fit
Height is often what decides a flat roof. Under first-floor windows, a pitched roof may not fit at all; a flat roof keeps the extension low while still giving a good ceiling height inside.
From first visit to completion
Site visits are free and there is no obligation. Where drawings are needed, the design stage is priced in writing before it starts.
Free site visit
We visit your Sandhurst home, measure up, talk through what you want and check the planning position.
Design and approvals
Once the layout is agreed, we deal with the council: planning permission or written confirmation that none is needed, plus building control.
Fixed written price
You receive a written, itemised price and programme. Nothing starts until you are happy with it.
Build and sign-off
Work is carried out to the agreed programme, inspected by building control and signed off at the end.
Questions people ask about flat roof extensions
How long does a flat roof extension take to build in Sandhurst?
On site, typically 10 to 16 weeks once approvals are in place. Before that, allow 4–12 weeks design and approvals.
Can I see a price before committing to anything?
Yes. The guide prices on this page are adjusted for Sandhurst, and the guide-price tool gives a range for your own size. After the survey you get a written price before anything is agreed.
Will my neighbours in Sandhurst be involved?
If a planning application or prior approval is needed, the council notifies neighbours. If the work is on or near a shared boundary, party wall notices may also be needed.
Can I walk on a flat roof extension?
Only for maintenance unless it is designed as a terrace. A roof terrace or balcony needs planning permission and a different structure.
Are flat roof extensions cheaper?
Usually slightly, because there is less roof structure and no tiles. Our guide range is about £1,960 to £3,750 per m² including VAT.
Book a free site visit in Sandhurst
We will measure up, check the planning position and give you honest guide figures.
- Free, no-obligation site visit
- Planning route checked before you spend on drawings
- Written price once the design is agreed
- Building control sign-off at the end
Prefer to talk? Call 0800 088 6341 or .
Book a free site visit
Tell us a little about the project and we will arrange a time.