Extension plans and drawings in Warwickshire
We prepare extension plans and drawings for homes across Warwickshire, on their own or as the first stage of a full design and build project.
- Guide priceFrom £1,150 inc VAT
- PlanningWe find the right route for you
- Towns covered8
- Site visitFree, no obligation

Towns in Warwickshire
Design and approval fees for Warwickshire
Guide fees for Warwickshire including VAT, using our West Midlands factor of ×0.97. Council and building control charges are not included.
| Option | What it covers | Guide price |
|---|---|---|
| Essential | Measured survey and planning drawings | £1,150 – £2,150 |
| Standard | Planning drawings plus building regulations drawings | £2,100 – £3,700 |
| Premium | Full pack with structural calculations and 3D visuals | £3,250 – £5,350 |
For a figure based on your own dimensions, use our guide-price tool.
Working in Warwickshire
Towns we cover in Warwickshire include Nuneaton, Rugby, Leamington Spa, Warwick, Bedworth, Stratford-upon-Avon, Kenilworth, Atherstone. Across the West Midlands, brick-built semis with long gardens are common, so single-storey and two-storey rear extensions are popular choices.
When it helps
- Homeowners at the very start of a project
- Projects that need a planning application or other approval
- Anyone who wants fixed designs before getting build prices
The most expensive changes are the ones made after the steel is ordered. A good design stage settles layout, heights, glazing and services on paper, so the build price is firm.
Planning and approvals in Warwickshire
In England the main routes are permitted development (ideally confirmed with a lawful development certificate, £274), larger home extension prior approval (£249, 42 days) and a householder planning application (£548, normally 8 weeks), with council fees as set from 1 April 2026.
The planning position for a specific Warwickshire address depends on its history and any designations, which is why we check it at the first visit.
Building regulations approval is separate from planning. In England you can use the council's building control team or a registered building control approver; a full plans application gets the drawings checked before work starts, and the inspector signs the work off with a completion certificate.
Building over or within 3 m of a public sewer needs the water company's consent, usually through a build-over agreement, before the foundations go in.
Applications are decided by the local planning authority (your district, borough or unitary council).
What happens next
Site visits are free and there is no obligation. Where drawings are needed, the design stage is priced in writing before it starts.
Free site visit
A designer visits, takes measurements and photos, and discusses layouts, budget and timing with you.
Design and approvals
Once the layout is agreed, we deal with the council: planning permission or written confirmation that none is needed, plus building control.
Fixed written price
With the design and specification agreed, you get a fixed written price and a start date.
Build and sign-off
Our team builds the extension, keeps you updated weekly and finishes with building control sign-off.
Common questions in Warwickshire
Do I need building regulations approval in Warwickshire?
Yes. Almost every extension needs it, whatever the planning route. We prepare the drawings and book the inspections.
How long does this take for a Warwickshire home?
2–6 weeks for drawings, depending on the council and the complexity of the project.
Can I see a price before committing to anything?
Yes. The guide prices on this page are adjusted for Warwickshire, and the guide-price tool gives a range for your own size. After the survey you get a written price before anything is agreed.
How much do extension plans cost?
Our design packs range from about £1,150 to £5,350 including VAT, from planning drawings only to a full pack with building regulations drawings, structural calculations and 3D views. Council fees are separate.
Can I use your drawings with another builder?
Yes. Once paid for, the drawings are yours to use for your project.
Book a free site visit in Warwickshire
We will measure up, check the planning position and give you honest guide figures.
- Free, no-obligation site visit
- Planning route checked before you spend on drawings
- Written price once the design is agreed
- Building control sign-off at the end
Prefer to talk? Call 0800 088 6341 or .
Book a free site visit
Tell us a little about the project and we will arrange a time.