Extension plans and drawings across Southend-on-Sea
For Southend-on-Sea homeowners we handle extension plans and drawings, with fees agreed in writing before any work starts.
- Guide price in Southend-on-SeaFrom £1,250 inc VAT
- PlanningWe find the right route for you
- Timescale2–6 weeks for drawings
- Postcode districtsSS0, SS1, SS2, SS3, SS4

Design and approval fees for Southend-on-Sea
These are guide fees for Southend-on-Sea, adjusted for East of England (×1.06) and including VAT. Council application and inspection fees are paid separately.
| Option | What it covers | Guide price |
|---|---|---|
| Essential | Measured survey and planning drawings | £1,250 – £2,350 |
| Standard | Planning drawings plus building regulations drawings | £2,300 – £4,050 |
| Premium | Full pack with structural calculations and 3D visuals | £3,600 – £5,850 |
Try the guide-price tool to see a range for your own size and finish.
Working in Southend-on-Sea
Site visits are available across Southend-on-Sea (SS0, SS1, SS2, SS3, SS4, SS9). Nearby, we also take on projects in Hadleigh (5 miles), Rayleigh (6 miles), Canvey Island (6 miles), Benfleet (7 miles).
For homes towards Kent, Gillingham is around 13 miles away. Across the East of England many houses sit on generous plots, and single-storey and wraparound extensions are a natural fit.
What we take care of
- Structural calculations from an engineer (full pack)
- 3D views to check the look and the light (full pack)
- Planning drawings: existing and proposed plans and elevations, site and location plans
- Building regulations drawings and specification
- Two or three layout options to compare
- Measured survey of the house and garden
Do I need planning permission in Southend-on-Sea?
In England the main routes are permitted development (ideally confirmed with a lawful development certificate, £274), larger home extension prior approval (£249, 42 days) and a householder planning application (£548, normally 8 weeks), with council fees as set from 1 April 2026.
Homes in conservation areas, national parks, National Landscapes (formerly AONBs), the Broads and World Heritage Sites have tighter rules, so we always check the property's status and planning history before design starts.
If the work involves a shared wall, building on the boundary, or digging foundations within 3 m (sometimes 6 m) of a neighbour's building, the Party Wall etc. Act 1996 applies and notice must be served before work starts: two months for work to a party wall, one month for new walls on the boundary and for excavations.
Building over or within 3 m of a public sewer needs the water company's consent, usually through a build-over agreement, before the foundations go in.
Applications are decided by the local planning authority (your district, borough or unitary council).
Our process, step by step
Site visits are free and there is no obligation. Where drawings are needed, the design stage is priced in writing before it starts.
Free site visit
We visit your Southend-on-Sea home, measure up, talk through what you want and check the planning position.
Design and approvals
We produce the drawings and structural design, and manage the approvals so they are in place before work starts.
Fixed written price
With the design and specification agreed, you get a fixed written price and a start date.
Build and sign-off
Work is carried out to the agreed programme, inspected by building control and signed off at the end.
Questions answered
Who do I contract with in Southend-on-Sea?
Your contract is with S&K Property Investments and Improvement Ltd, which designs and manages the project and the build teams who carry it out.
Do I need building regulations approval in Southend-on-Sea?
Yes. Almost every extension needs it, whatever the planning route. We prepare the drawings and book the inspections.
Can I see a price before committing to anything?
Yes. The guide prices on this page are adjusted for Southend-on-Sea, and the guide-price tool gives a range for your own size. After the survey you get a written price before anything is agreed.
Do I need an architect?
Not necessarily. For most extensions an experienced designer or architectural technologist is enough. For listed buildings or complex sites an architect’s input can help.
How much do extension plans cost?
Our design packs range from about £1,250 to £5,850 including VAT, from planning drawings only to a full pack with building regulations drawings, structural calculations and 3D views. Council fees are separate.
Book a free site visit in Southend-on-Sea
We will measure up, check the planning position and give you honest guide figures.
- Free, no-obligation site visit
- Planning route checked before you spend on drawings
- Written price once the design is agreed
- Building control sign-off at the end
Prefer to talk? Call 0800 088 6341 or .
Book a free site visit
Tell us a little about the project and we will arrange a time.