Extension plans and drawings in Hadleigh
For Hadleigh homeowners we handle extension plans and drawings, with fees agreed in writing before any work starts.
- Guide price in HadleighFrom £1,250 inc VAT
- PlanningWe find the right route for you
- Timescale2–6 weeks for drawings
- Postcode districtsSS7, SS9

What it costs in Hadleigh
Guide fees for Hadleigh including VAT, using our East of England factor of ×1.06. Council and building control charges are not included.
| Option | What it covers | Guide price |
|---|---|---|
| Essential | Measured survey and planning drawings | £1,250 – £2,350 |
| Standard | Planning drawings plus building regulations drawings | £2,300 – £4,050 |
| Premium | Full pack with structural calculations and 3D visuals | £3,600 – £5,850 |
Want a range for your exact size? The guide-price tool takes about a minute.
Working in Hadleigh
We cover Hadleigh and the postcode districts SS7, SS9. We also work in nearby Benfleet (2 miles), Rayleigh (2 miles), Canvey Island (2 miles), Southend-on-Sea (5 miles).
The East of England mixes market-town terraces, inter-war semis and modern estates. Clay soils are common in parts of the region, which can affect foundation design.
Will the council need to approve it?
In England the main routes are permitted development (ideally confirmed with a lawful development certificate, £274), larger home extension prior approval (£249, 42 days) and a householder planning application (£548, normally 8 weeks), with council fees as set from 1 April 2026.
Homes in conservation areas, national parks, National Landscapes (formerly AONBs), the Broads and World Heritage Sites have tighter rules, so we always check the property's status and planning history before design starts.
Building regulations approval is separate from planning. In England you can use the council's building control team or a registered building control approver; a full plans application gets the drawings checked before work starts, and the inspector signs the work off with a completion certificate.
Building over or within 3 m of a public sewer needs the water company's consent, usually through a build-over agreement, before the foundations go in.
Applications are decided by the local planning authority (your district, borough or unitary council).
Who this service is for
- Homeowners at the very start of a project
- Anyone who wants fixed designs before getting build prices
- Projects that need a planning application or other approval
The most expensive changes are the ones made after the steel is ordered. A good design stage settles layout, heights, glazing and services on paper, so the build price is firm.
From first visit to completion
Site visits are free and there is no obligation. Where drawings are needed, the design stage is priced in writing before it starts.
Free site visit
We visit your Hadleigh home, measure up, talk through what you want and check the planning position.
Design and approvals
We draw the design, agree it with you and handle planning or permitted development checks and building regulations.
Fixed written price
With the design and specification agreed, you get a fixed written price and a start date.
Build and sign-off
The build is managed from start to finish, inspected at each stage and signed off on completion.
Questions answered
How long does this take for a Hadleigh home?
2–6 weeks for drawings, depending on the council and the complexity of the project.
Who do I contract with in Hadleigh?
Your contract is with S&K Property Investments and Improvement Ltd, which designs and manages the project and the build teams who carry it out.
Can I see a price before committing to anything?
Yes. The guide prices on this page are adjusted for Hadleigh, and the guide-price tool gives a range for your own size. After the survey you get a written price before anything is agreed.
How much do extension plans cost?
Our design packs range from about £1,250 to £5,850 including VAT, from planning drawings only to a full pack with building regulations drawings, structural calculations and 3D views. Council fees are separate.
Can I use your drawings with another builder?
Yes. Once paid for, the drawings are yours to use for your project.
Book a free site visit in Hadleigh
We will measure up, check the planning position and give you honest guide figures.
- Free, no-obligation site visit
- Planning route checked before you spend on drawings
- Written price once the design is agreed
- Building control sign-off at the end
Prefer to talk? Call 0800 088 6341 or .
Book a free site visit
Tell us a little about the project and we will arrange a time.