house-extension.uk

Extension plans and drawings in Earl Shilton

We prepare extension plans and drawings for homes in Earl Shilton, as a stand-alone service or as the first stage of a design and build project.

  • Guide price in Earl ShiltonFrom £1,100 inc VAT
  • PlanningWe find the right route for you
  • Timescale2–6 weeks for drawings
  • Postcode districtsLE9
Extension floor plans and elevations with a scale ruler and laser measure

Local to Earl Shilton

We cover Earl Shilton and the postcode districts LE9. Neighbouring towns we cover include Hinckley (4 miles), Leicester (9 miles), Wigston (9 miles), Oadby (10 miles).

The East Midlands has plenty of inter-war and post-war semis and detached houses with room to extend, alongside Victorian terraces in the towns.

Fees in Earl Shilton

Guide fees for Earl Shilton including VAT, using our East Midlands factor of ×0.95. Council and building control charges are not included.

OptionWhat it coversGuide price
EssentialMeasured survey and planning drawings£1,100 – £2,100
StandardPlanning drawings plus building regulations drawings£2,050 – £3,650
PremiumFull pack with structural calculations and 3D visuals£3,200 – £5,250

Want a range for your exact size? The guide-price tool takes about a minute.

Planning rules that apply in Earl Shilton

In England the main routes are permitted development (ideally confirmed with a lawful development certificate, £274), larger home extension prior approval (£249, 42 days) and a householder planning application (£548, normally 8 weeks), with council fees as set from 1 April 2026.

In a conservation area, national park, National Landscape, the Broads or a World Heritage Site the permitted development limits are tighter (no side or two-storey extensions without an application). Listed homes need listed building consent, and if permitted development rights have been removed, any extension needs an application.

If the work involves a shared wall, building on the boundary, or digging foundations within 3 m (sometimes 6 m) of a neighbour's building, the Party Wall etc. Act 1996 applies and notice must be served before work starts: two months for work to a party wall, one month for new walls on the boundary and for excavations.

Building over or within 3 m of a public sewer needs the water company's consent, usually through a build-over agreement, before the foundations go in.

Applications are decided by the local planning authority (your district, borough or unitary council).

What we take care of

  • Two or three layout options to compare
  • Measured survey of the house and garden
  • Structural calculations from an engineer (full pack)
  • Planning drawings: existing and proposed plans and elevations, site and location plans

The most expensive changes are the ones made after the steel is ordered. A good design stage settles layout, heights, glazing and services on paper, so the build price is firm.

What happens next

Site visits are free and there is no obligation. Where drawings are needed, the design stage is priced in writing before it starts.

  1. Free site visit

    It starts with a visit to your house to measure, check access and talk through ideas and budget.

  2. Design and approvals

    We produce the drawings and structural design, and manage the approvals so they are in place before work starts.

  3. Fixed written price

    You receive a written, itemised price and programme. Nothing starts until you are happy with it.

  4. Build and sign-off

    Work is carried out to the agreed programme, inspected by building control and signed off at the end.

Questions answered

Will my neighbours in Earl Shilton be involved?

If a planning application or prior approval is needed, the council notifies neighbours. If the work is on or near a shared boundary, party wall notices may also be needed.

How long does this take for a Earl Shilton home?

2–6 weeks for drawings, depending on the council and the complexity of the project.

Do you cover all of Earl Shilton?

Yes. We cover Earl Shilton and the surrounding parts of Leicestershire. Site visits are free and there is no obligation.

Do I need an architect?

Not necessarily. For most extensions an experienced designer or architectural technologist is enough. For listed buildings or complex sites an architect’s input can help.

Can I use your drawings with another builder?

Yes. Once paid for, the drawings are yours to use for your project.

Book a free site visit in Earl Shilton

We will measure up, check the planning position and give you honest guide figures.

  • Free, no-obligation site visit
  • Planning route checked before you spend on drawings
  • Written price once the design is agreed
  • Building control sign-off at the end

Prefer to talk? Call 0800 088 6341 or .

Book a free site visit

Tell us a little about the project and we will arrange a time.

Please enter a valid UK postcode.
Please choose an option.
Please enter your name.
Please enter a phone number.
Please enter a valid email.

We use your details only to reply to this enquiry and prepare your quote. Privacy notice.

Call usGet a quote