Planning permission for extensions in Warminster
We prepare planning permission for extensions for homes in Warminster, as a stand-alone service or as the first stage of a design and build project.
- Guide price in WarminsterFrom £350 inc VAT
- PlanningWe find the right route for you
- Timescale8–13 weeks typical decision period
- Postcode districtsBA12

What it costs in Warminster
Guide fees for Warminster including VAT, using our South West England factor of ×1.02. Council and building control charges are not included.
| Option | What it covers | Guide price |
|---|---|---|
| Essential | Permitted development confirmed in writing (certificate or notification) | £350 – £700 |
| Standard | Householder planning application handled | £600 – £1,150 |
| Premium | Application with heritage or design statements, and responses to the council | £900 – £1,650 |
Our handling fee only. Council fees are extra: in England from 1 April 2026 a householder application is £548, a lawful development certificate for a proposed extension £274 and a larger home extension prior approval £249. Drawings are priced separately.
Want a range for your exact size? The guide-price tool takes about a minute.
Included in a typical project
- Planning history and constraints check for your address
- Route recommendation in writing
- Liaison with the planning officer
- Submission and fee payment guidance
A lawful development certificate is not compulsory for permitted development, but it is the cleanest proof that the extension was lawful when you come to sell. We usually recommend one.
Local to Warminster
Postcode districts we cover around Warminster include BA12. Nearby, we also take on projects in Trowbridge (10 miles), Melksham (14 miles), Devizes (14 miles), Salisbury (18 miles).
For homes towards Somerset, Frome is around 7 miles away. South West homes range from terraced streets in the cities to stone cottages and bungalows in the countryside, and conservation areas are common in historic centres.
Do I need planning permission in Warminster?
In England the main routes are permitted development (ideally confirmed with a lawful development certificate, £274), larger home extension prior approval (£249, 42 days) and a householder planning application (£548, normally 8 weeks), with council fees as set from 1 April 2026.
The planning position for a specific Warminster address depends on its history and any designations, which is why we check it at the first visit.
Building over or within 3 m of a public sewer needs the water company's consent, usually through a build-over agreement, before the foundations go in.
If the work involves a shared wall, building on the boundary, or digging foundations within 3 m (sometimes 6 m) of a neighbour's building, the Party Wall etc. Act 1996 applies and notice must be served before work starts: two months for work to a party wall, one month for new walls on the boundary and for excavations.
Applications are decided by the local planning authority (your district, borough or unitary council).
What happens next
Site visits are free and there is no obligation. Where drawings are needed, the design stage is priced in writing before it starts.
Free site visit
We visit your Warminster home, measure up, talk through what you want and check the planning position.
Design and approvals
We produce the drawings and structural design, and manage the approvals so they are in place before work starts.
Fixed written price
We confirm the build price in writing, based on the approved drawings and the finishes you have chosen.
Build and sign-off
The build is managed from start to finish, inspected at each stage and signed off on completion.
Common questions in Warminster
Who do I contract with in Warminster?
Your contract is with S&K Property Investments and Improvement Ltd, which designs and manages the project and the build teams who carry it out.
Do you cover all of Warminster?
Yes. We cover Warminster and the surrounding parts of Wiltshire. Site visits are free and there is no obligation.
How long does this take for a Warminster home?
8–13 weeks typical decision period, depending on the council and the complexity of the project.
How much does planning permission cost?
In England, from 1 April 2026 the council fee is £548 for a householder application, £274 for a lawful development certificate for a proposed extension and £249 for larger home extension prior approval. Our handling fee is separate.
What happens if planning is refused?
You can revise the design and reapply, or appeal. We read the officer’s report and tell you honestly which option has a better chance.
Book a free site visit in Warminster
We will measure up, check the planning position and give you honest guide figures.
- Free, no-obligation site visit
- Planning route checked before you spend on drawings
- Written price once the design is agreed
- Building control sign-off at the end
Prefer to talk? Call 0800 088 6341 or .
Book a free site visit
Tell us a little about the project and we will arrange a time.