house-extension.uk

Planning permission for extensions in Devizes

We prepare planning permission for extensions for homes in Devizes, as a stand-alone service or as the first stage of a design and build project.

  • Guide price in DevizesFrom £350 inc VAT
  • PlanningWe find the right route for you
  • Timescale8–13 weeks typical decision period
  • Postcode districtsSN10
Homeowners reviewing extension elevation drawings and a 3D view on a tablet

Fees in Devizes

These are guide fees for Devizes, adjusted for South West England (×1.02) and including VAT. Council application and inspection fees are paid separately.

OptionWhat it coversGuide price
EssentialPermitted development confirmed in writing (certificate or notification)£350 – £700
StandardHouseholder planning application handled£600 – £1,150
PremiumApplication with heritage or design statements, and responses to the council£900 – £1,650

Our handling fee only. Council fees are extra: in England from 1 April 2026 a householder application is £548, a lawful development certificate for a proposed extension £274 and a larger home extension prior approval £249. Drawings are priced separately.

Want a range for your exact size? The guide-price tool takes about a minute.

When it helps

  • Projects in conservation areas or with previous refusals
  • Homeowners who would rather not deal with the council themselves
  • Anyone unsure whether their extension needs permission

A lawful development certificate is not compulsory for permitted development, but it is the cleanest proof that the extension was lawful when you come to sell. We usually recommend one.

Do I need planning permission in Devizes?

In England the main routes are permitted development (ideally confirmed with a lawful development certificate, £274), larger home extension prior approval (£249, 42 days) and a householder planning application (£548, normally 8 weeks), with council fees as set from 1 April 2026.

In a conservation area, national park, National Landscape, the Broads or a World Heritage Site the permitted development limits are tighter (no side or two-storey extensions without an application). Listed homes need listed building consent, and if permitted development rights have been removed, any extension needs an application.

If the work involves a shared wall, building on the boundary, or digging foundations within 3 m (sometimes 6 m) of a neighbour's building, the Party Wall etc. Act 1996 applies and notice must be served before work starts: two months for work to a party wall, one month for new walls on the boundary and for excavations.

Applications are decided by the local planning authority (your district, borough or unitary council).

Local to Devizes

We cover Devizes and the postcode districts SN10. We also work in nearby Melksham (7 miles), Calne (7 miles), Trowbridge (10 miles), Chippenham (10 miles).

For homes towards Somerset, Frome is around 16 miles away. South West homes range from terraced streets in the cities to stone cottages and bungalows in the countryside, and conservation areas are common in historic centres.

Our process, step by step

Site visits are free and there is no obligation. Where drawings are needed, the design stage is priced in writing before it starts.

  1. Free site visit

    It starts with a visit to your house to measure, check access and talk through ideas and budget.

  2. Design and approvals

    We produce the drawings and structural design, and manage the approvals so they are in place before work starts.

  3. Fixed written price

    You receive a written, itemised price and programme. Nothing starts until you are happy with it.

  4. Build and sign-off

    The build is managed from start to finish, inspected at each stage and signed off on completion.

Common questions in Devizes

Do I need building regulations approval in Devizes?

Yes. Almost every extension needs it, whatever the planning route. We prepare the drawings and book the inspections.

How long does this take for a Devizes home?

8–13 weeks typical decision period, depending on the council and the complexity of the project.

Can I see a price before committing to anything?

Yes. The guide prices on this page are adjusted for Devizes, and the guide-price tool gives a range for your own size. After the survey you get a written price before anything is agreed.

What happens if planning is refused?

You can revise the design and reapply, or appeal. We read the officer’s report and tell you honestly which option has a better chance.

How much does planning permission cost?

In England, from 1 April 2026 the council fee is £548 for a householder application, £274 for a lawful development certificate for a proposed extension and £249 for larger home extension prior approval. Our handling fee is separate.

Book a free site visit in Devizes

We will measure up, check the planning position and give you honest guide figures.

  • Free, no-obligation site visit
  • Planning route checked before you spend on drawings
  • Written price once the design is agreed
  • Building control sign-off at the end

Prefer to talk? Call 0800 088 6341 or .

Book a free site visit

Tell us a little about the project and we will arrange a time.

Please enter a valid UK postcode.
Please choose an option.
Please enter your name.
Please enter a phone number.
Please enter a valid email.

We use your details only to reply to this enquiry and prepare your quote. Privacy notice.

Call usGet a quote