Planning permission for extensions in Surbiton
We prepare planning permission for extensions for homes in Surbiton, as a stand-alone service or as the first stage of a design and build project.
- Guide price in SurbitonFrom £450 inc VAT
- PlanningWe find the right route for you
- Timescale8–13 weeks typical decision period
- Postcode districtsKT1, KT2, KT3, KT5, KT6

What it costs in Surbiton
These are guide fees for Surbiton, adjusted for London (×1.3) and including VAT. Council application and inspection fees are paid separately.
| Option | What it covers | Guide price |
|---|---|---|
| Essential | Permitted development confirmed in writing (certificate or notification) | £450 – £850 |
| Standard | Householder planning application handled | £750 – £1,450 |
| Premium | Application with heritage or design statements, and responses to the council | £1,150 – £2,100 |
Our handling fee only. Council fees are extra: in England from 1 April 2026 a householder application is £548, a lawful development certificate for a proposed extension £274 and a larger home extension prior approval £249. Drawings are priced separately.
Try the guide-price tool to see a range for your own size and finish.
Who this service is for
- Anyone unsure whether their extension needs permission
- Homeowners who would rather not deal with the council themselves
- Projects in conservation areas or with previous refusals
Extensions in and around Surbiton
Across KT1, KT2, KT3, KT5, KT6, KT9, we can visit, measure and advise. Nearby, we also take on projects in Hook (2 miles), New Malden (2 miles), Chessington (2 miles), Worcester Park (2 miles).
East Molesey, in Surrey, is roughly 2 miles from Surbiton and also on our list. Across London, terraced houses with narrow side returns and tight access are the norm, which shapes everything from party wall notices to how materials reach the back garden.
Do I need planning permission in Surbiton?
In England the main routes are permitted development (ideally confirmed with a lawful development certificate, £274), larger home extension prior approval (£249, 42 days) and a householder planning application (£548, normally 8 weeks), with council fees as set from 1 April 2026.
In a conservation area, national park, National Landscape, the Broads or a World Heritage Site the permitted development limits are tighter (no side or two-storey extensions without an application). Listed homes need listed building consent, and if permitted development rights have been removed, any extension needs an application.
Building over or within 3 m of a public sewer needs the water company's consent, usually through a build-over agreement, before the foundations go in.
If the work involves a shared wall, building on the boundary, or digging foundations within 3 m (sometimes 6 m) of a neighbour's building, the Party Wall etc. Act 1996 applies and notice must be served before work starts: two months for work to a party wall, one month for new walls on the boundary and for excavations.
Applications are decided by the local planning authority (your district, borough or unitary council).
What happens next
Site visits are free and there is no obligation. Where drawings are needed, the design stage is priced in writing before it starts.
Free site visit
We visit your Surbiton home, measure up, talk through what you want and check the planning position.
Design and approvals
We produce the drawings and structural design, and manage the approvals so they are in place before work starts.
Fixed written price
You receive a written, itemised price and programme. Nothing starts until you are happy with it.
Build and sign-off
The build is managed from start to finish, inspected at each stage and signed off on completion.
Questions answered
Can I see a price before committing to anything?
Yes. The guide prices on this page are adjusted for Surbiton, and the guide-price tool gives a range for your own size. After the survey you get a written price before anything is agreed.
Will my neighbours in Surbiton be involved?
If a planning application or prior approval is needed, the council notifies neighbours. If the work is on or near a shared boundary, party wall notices may also be needed.
How long does this take for a Surbiton home?
8–13 weeks typical decision period, depending on the council and the complexity of the project.
How much does planning permission cost?
In England, from 1 April 2026 the council fee is £548 for a householder application, £274 for a lawful development certificate for a proposed extension and £249 for larger home extension prior approval. Our handling fee is separate.
What happens if planning is refused?
You can revise the design and reapply, or appeal. We read the officer’s report and tell you honestly which option has a better chance.
Book a free site visit in Surbiton
We will measure up, check the planning position and give you honest guide figures.
- Free, no-obligation site visit
- Planning route checked before you spend on drawings
- Written price once the design is agreed
- Building control sign-off at the end
Prefer to talk? Call 0800 088 6341 or .
Book a free site visit
Tell us a little about the project and we will arrange a time.