Planning permission for extensions across New Malden
Need planning permission for extensions in New Malden? We survey the house, prepare what the council needs and deal with the officers until a decision is made.
- Guide price in New MaldenFrom £450 inc VAT
- PlanningWe find the right route for you
- Timescale8–13 weeks typical decision period
- Postcode districtsKT1, KT2, KT3, KT4, KT5

Fees in New Malden
Guide fees for New Malden including VAT, using our London factor of ×1.3. Council and building control charges are not included.
| Option | What it covers | Guide price |
|---|---|---|
| Essential | Permitted development confirmed in writing (certificate or notification) | £450 – £850 |
| Standard | Householder planning application handled | £750 – £1,450 |
| Premium | Application with heritage or design statements, and responses to the council | £1,150 – £2,100 |
Our handling fee only. Council fees are extra: in England from 1 April 2026 a householder application is £548, a lawful development certificate for a proposed extension £274 and a larger home extension prior approval £249. Drawings are priced separately.
Want a range for your exact size? The guide-price tool takes about a minute.
Included in a typical project
- Liaison with the planning officer
- Planning history and constraints check for your address
- Route recommendation in writing
- Advice if conditions are attached or changes are requested
- Submission and fee payment guidance
A lawful development certificate is not compulsory for permitted development, but it is the cleanest proof that the extension was lawful when you come to sell. We usually recommend one.
Do I need planning permission in New Malden?
In England the main routes are permitted development (ideally confirmed with a lawful development certificate, £274), larger home extension prior approval (£249, 42 days) and a householder planning application (£548, normally 8 weeks), with council fees as set from 1 April 2026.
In a conservation area, national park, National Landscape, the Broads or a World Heritage Site the permitted development limits are tighter (no side or two-storey extensions without an application). Listed homes need listed building consent, and if permitted development rights have been removed, any extension needs an application.
Building over or within 3 m of a public sewer needs the water company's consent, usually through a build-over agreement, before the foundations go in.
Applications are decided by the local planning authority (your district, borough or unitary council).
Local to New Malden
Postcode districts we cover around New Malden include KT1, KT2, KT3, KT4, KT5, SW20. Neighbouring towns we cover include Worcester Park (2 miles), Surbiton (2 miles), Morden (3 miles), Wimbledon (3 miles).
Across London, terraced houses with narrow side returns and tight access are the norm, which shapes everything from party wall notices to how materials reach the back garden.
Our process, step by step
Site visits are free and there is no obligation. Where drawings are needed, the design stage is priced in writing before it starts.
Free site visit
First, a site visit: we look at the house, garden, access and drains and listen to what you need.
Design and approvals
Once the layout is agreed, we deal with the council: planning permission or written confirmation that none is needed, plus building control.
Fixed written price
We confirm the build price in writing, based on the approved drawings and the finishes you have chosen.
Build and sign-off
Work is carried out to the agreed programme, inspected by building control and signed off at the end.
Common questions in New Malden
Do you cover all of New Malden?
Yes. We cover New Malden and the surrounding parts of Greater London. Site visits are free and there is no obligation.
How long does this take for a New Malden home?
8–13 weeks typical decision period, depending on the council and the complexity of the project.
Do I need building regulations approval in New Malden?
Yes. Almost every extension needs it, whatever the planning route. We prepare the drawings and book the inspections.
What happens if planning is refused?
You can revise the design and reapply, or appeal. We read the officer’s report and tell you honestly which option has a better chance.
How much does planning permission cost?
In England, from 1 April 2026 the council fee is £548 for a householder application, £274 for a lawful development certificate for a proposed extension and £249 for larger home extension prior approval. Our handling fee is separate.
Book a free site visit in New Malden
We will measure up, check the planning position and give you honest guide figures.
- Free, no-obligation site visit
- Planning route checked before you spend on drawings
- Written price once the design is agreed
- Building control sign-off at the end
Prefer to talk? Call 0800 088 6341 or .
Book a free site visit
Tell us a little about the project and we will arrange a time.