house-extension.uk

Planning permission for extensions across Stalybridge

For Stalybridge homeowners we handle planning permission for extensions, with fees agreed in writing before any work starts.

  • Guide price in StalybridgeFrom £300 inc VAT
  • PlanningWe find the right route for you
  • Timescale8–13 weeks typical decision period
  • Postcode districtsOL6, OL7, SK14, SK15, SK16
Homeowners reviewing extension elevation drawings and a 3D view on a tablet

Covering Stalybridge

Site visits are available across Stalybridge (OL6, OL7, SK14, SK15, SK16). Nearby, we also take on projects in Dukinfield (1 mile), Ashton-under-Lyne (2 miles), Hyde (2 miles), Denton (3 miles).

Just over the Cheshire border, Wilmslow is about 13 miles away. The North West has a high share of Victorian and Edwardian terraces with rear yards and outriggers, plus large areas of inter-war semis in the suburbs.

Design and approval fees for Stalybridge

Fees below are our Stalybridge guide (×0.95, the North West England factor), including VAT. Council and building control fees are extra.

OptionWhat it coversGuide price
EssentialPermitted development confirmed in writing (certificate or notification)£300 – £650
StandardHouseholder planning application handled£550 – £1,050
PremiumApplication with heritage or design statements, and responses to the council£850 – £1,550

Our handling fee only. Council fees are extra: in England from 1 April 2026 a householder application is £548, a lawful development certificate for a proposed extension £274 and a larger home extension prior approval £249. Drawings are priced separately.

Try the guide-price tool to see a range for your own size and finish.

Do I need planning permission in Stalybridge?

In England the main routes are permitted development (ideally confirmed with a lawful development certificate, £274), larger home extension prior approval (£249, 42 days) and a householder planning application (£548, normally 8 weeks), with council fees as set from 1 April 2026.

In a conservation area, national park, National Landscape, the Broads or a World Heritage Site the permitted development limits are tighter (no side or two-storey extensions without an application). Listed homes need listed building consent, and if permitted development rights have been removed, any extension needs an application.

Building regulations approval is separate from planning. In England you can use the council's building control team or a registered building control approver; a full plans application gets the drawings checked before work starts, and the inspector signs the work off with a completion certificate.

Applications are decided by the local planning authority (your district, borough or unitary council).

When it helps

  • Anyone unsure whether their extension needs permission
  • Projects in conservation areas or with previous refusals
  • Homeowners who would rather not deal with the council themselves

What happens next

Site visits are free and there is no obligation. Where drawings are needed, the design stage is priced in writing before it starts.

  1. Free site visit

    A designer visits, takes measurements and photos, and discusses layouts, budget and timing with you.

  2. Design and approvals

    Drawings are prepared and agreed with you, then submitted for the right planning route and building regulations approval.

  3. Fixed written price

    The price is fixed in writing once the design is settled, with a clear programme and payment stages.

  4. Build and sign-off

    The build is managed from start to finish, inspected at each stage and signed off on completion.

Questions answered

Will my neighbours in Stalybridge be involved?

If a planning application or prior approval is needed, the council notifies neighbours. If the work is on or near a shared boundary, party wall notices may also be needed.

Do you cover all of Stalybridge?

Yes. We cover Stalybridge and the surrounding parts of Greater Manchester. Site visits are free and there is no obligation.

How long does this take for a Stalybridge home?

8–13 weeks typical decision period, depending on the council and the complexity of the project.

How much does planning permission cost?

In England, from 1 April 2026 the council fee is £548 for a householder application, £274 for a lawful development certificate for a proposed extension and £249 for larger home extension prior approval. Our handling fee is separate.

What happens if planning is refused?

You can revise the design and reapply, or appeal. We read the officer’s report and tell you honestly which option has a better chance.

Book a free site visit in Stalybridge

We will measure up, check the planning position and give you honest guide figures.

  • Free, no-obligation site visit
  • Planning route checked before you spend on drawings
  • Written price once the design is agreed
  • Building control sign-off at the end

Prefer to talk? Call 0800 088 6341 or .

Book a free site visit

Tell us a little about the project and we will arrange a time.

Please enter a valid UK postcode.
Please choose an option.
Please enter your name.
Please enter a phone number.
Please enter a valid email.

We use your details only to reply to this enquiry and prepare your quote. Privacy notice.

Call usGet a quote