house-extension.uk

Planning permission for extensions across Ashton-under-Lyne

For Ashton-under-Lyne homeowners we handle planning permission for extensions, with fees agreed in writing before any work starts.

  • Guide price in Ashton-under-LyneFrom £300 inc VAT
  • PlanningWe find the right route for you
  • Timescale8–13 weeks typical decision period
  • Postcode districtsM34, M43, OL6, OL7, SK15
Homeowners reviewing extension elevation drawings and a 3D view on a tablet

Local to Ashton-under-Lyne

Our survey diary covers Ashton-under-Lyne, including M34, M43, OL6, OL7, SK15, SK16. The same team covers Dukinfield (1 mile), Stalybridge (2 miles), Droylsden (2 miles), Denton (2 miles), all within easy reach.

Just over the Cheshire border, Wilmslow is about 12 miles away. The North West has a high share of Victorian and Edwardian terraces with rear yards and outriggers, plus large areas of inter-war semis in the suburbs.

Fees in Ashton-under-Lyne

Fees below are our Ashton-under-Lyne guide (×0.95, the North West England factor), including VAT. Council and building control fees are extra.

OptionWhat it coversGuide price
EssentialPermitted development confirmed in writing (certificate or notification)£300 – £650
StandardHouseholder planning application handled£550 – £1,050
PremiumApplication with heritage or design statements, and responses to the council£850 – £1,550

Our handling fee only. Council fees are extra: in England from 1 April 2026 a householder application is £548, a lawful development certificate for a proposed extension £274 and a larger home extension prior approval £249. Drawings are priced separately.

Want a range for your exact size? The guide-price tool takes about a minute.

Planning and approvals in Ashton-under-Lyne

In England the main routes are permitted development (ideally confirmed with a lawful development certificate, £274), larger home extension prior approval (£249, 42 days) and a householder planning application (£548, normally 8 weeks), with council fees as set from 1 April 2026.

In a conservation area, national park, National Landscape, the Broads or a World Heritage Site the permitted development limits are tighter (no side or two-storey extensions without an application). Listed homes need listed building consent, and if permitted development rights have been removed, any extension needs an application.

Building over or within 3 m of a public sewer needs the water company's consent, usually through a build-over agreement, before the foundations go in.

Applications are decided by the local planning authority (your district, borough or unitary council).

Included in a typical project

  • Route recommendation in writing
  • Application forms, plans and supporting statements
  • Planning history and constraints check for your address
  • Submission and fee payment guidance
  • Advice if conditions are attached or changes are requested

A lawful development certificate is not compulsory for permitted development, but it is the cleanest proof that the extension was lawful when you come to sell. We usually recommend one.

How the project works

Site visits are free and there is no obligation. Where drawings are needed, the design stage is priced in writing before it starts.

  1. Free site visit

    First, a site visit: we look at the house, garden, access and drains and listen to what you need.

  2. Design and approvals

    Drawings are prepared and agreed with you, then submitted for the right planning route and building regulations approval.

  3. Fixed written price

    With the design and specification agreed, you get a fixed written price and a start date.

  4. Build and sign-off

    The build is managed from start to finish, inspected at each stage and signed off on completion.

Questions answered

Do I need building regulations approval in Ashton-under-Lyne?

Yes. Almost every extension needs it, whatever the planning route. We prepare the drawings and book the inspections.

Do you cover all of Ashton-under-Lyne?

Yes. We cover Ashton-under-Lyne and the surrounding parts of Greater Manchester. Site visits are free and there is no obligation.

Will my neighbours in Ashton-under-Lyne be involved?

If a planning application or prior approval is needed, the council notifies neighbours. If the work is on or near a shared boundary, party wall notices may also be needed.

What happens if planning is refused?

You can revise the design and reapply, or appeal. We read the officer’s report and tell you honestly which option has a better chance.

How much does planning permission cost?

In England, from 1 April 2026 the council fee is £548 for a householder application, £274 for a lawful development certificate for a proposed extension and £249 for larger home extension prior approval. Our handling fee is separate.

Book a free site visit in Ashton-under-Lyne

We will measure up, check the planning position and give you honest guide figures.

  • Free, no-obligation site visit
  • Planning route checked before you spend on drawings
  • Written price once the design is agreed
  • Building control sign-off at the end

Prefer to talk? Call 0800 088 6341 or .

Book a free site visit

Tell us a little about the project and we will arrange a time.

Please enter a valid UK postcode.
Please choose an option.
Please enter your name.
Please enter a phone number.
Please enter a valid email.

We use your details only to reply to this enquiry and prepare your quote. Privacy notice.

Call usGet a quote