Planning permission for extensions in Ludlow
Need planning permission for extensions in Ludlow? We survey the house, prepare what the council needs and deal with the officers until a decision is made.
- Guide price in LudlowFrom £300 inc VAT
- PlanningWe find the right route for you
- Timescale8–13 weeks typical decision period
- Postcode districtsSY8

Design and approval fees for Ludlow
Guide fees for Ludlow including VAT, using our West Midlands factor of ×0.97. Council and building control charges are not included.
| Option | What it covers | Guide price |
|---|---|---|
| Essential | Permitted development confirmed in writing (certificate or notification) | £300 – £650 |
| Standard | Householder planning application handled | £550 – £1,100 |
| Premium | Application with heritage or design statements, and responses to the council | £850 – £1,600 |
Our handling fee only. Council fees are extra: in England from 1 April 2026 a householder application is £548, a lawful development certificate for a proposed extension £274 and a larger home extension prior approval £249. Drawings are priced separately.
Try the guide-price tool to see a range for your own size and finish.
Working in Ludlow
Across SY8, we can visit, measure and advise. We also work in nearby Bridgnorth (15 miles), Telford (24 miles), Shrewsbury (24 miles), Wellington (24 miles).
The West Midlands has a large stock of 1930s and post-war semi-detached houses, which are well suited to rear, side and over-garage extensions, plus Victorian terraces in the older inner areas.
Do I need planning permission in Ludlow?
In England the main routes are permitted development (ideally confirmed with a lawful development certificate, £274), larger home extension prior approval (£249, 42 days) and a householder planning application (£548, normally 8 weeks), with council fees as set from 1 April 2026.
In a conservation area, national park, National Landscape, the Broads or a World Heritage Site the permitted development limits are tighter (no side or two-storey extensions without an application). Listed homes need listed building consent, and if permitted development rights have been removed, any extension needs an application.
Building regulations approval is separate from planning. In England you can use the council's building control team or a registered building control approver; a full plans application gets the drawings checked before work starts, and the inspector signs the work off with a completion certificate.
Applications are decided by the local planning authority (your district, borough or unitary council).
Who this service is for
- Projects in conservation areas or with previous refusals
- Homeowners who would rather not deal with the council themselves
- Anyone unsure whether their extension needs permission
Our process, step by step
Site visits are free and there is no obligation. Where drawings are needed, the design stage is priced in writing before it starts.
Free site visit
It starts with a visit to your house to measure, check access and talk through ideas and budget.
Design and approvals
We produce the drawings and structural design, and manage the approvals so they are in place before work starts.
Fixed written price
We confirm the build price in writing, based on the approved drawings and the finishes you have chosen.
Build and sign-off
The build is managed from start to finish, inspected at each stage and signed off on completion.
Questions answered
Will my neighbours in Ludlow be involved?
If a planning application or prior approval is needed, the council notifies neighbours. If the work is on or near a shared boundary, party wall notices may also be needed.
Can I see a price before committing to anything?
Yes. The guide prices on this page are adjusted for Ludlow, and the guide-price tool gives a range for your own size. After the survey you get a written price before anything is agreed.
Do you cover all of Ludlow?
Yes. We cover Ludlow and the surrounding parts of Shropshire. Site visits are free and there is no obligation.
How much does planning permission cost?
In England, from 1 April 2026 the council fee is £548 for a householder application, £274 for a lawful development certificate for a proposed extension and £249 for larger home extension prior approval. Our handling fee is separate.
What happens if planning is refused?
You can revise the design and reapply, or appeal. We read the officer’s report and tell you honestly which option has a better chance.
Book a free site visit in Ludlow
We will measure up, check the planning position and give you honest guide figures.
- Free, no-obligation site visit
- Planning route checked before you spend on drawings
- Written price once the design is agreed
- Building control sign-off at the end
Prefer to talk? Call 0800 088 6341 or .
Book a free site visit
Tell us a little about the project and we will arrange a time.