house-extension.uk

Planning permission for extensions across Leicester

For Leicester homeowners we handle planning permission for extensions, with fees agreed in writing before any work starts.

  • Guide price in LeicesterFrom £300 inc VAT
  • PlanningWe find the right route for you
  • Timescale8–13 weeks typical decision period
  • Postcode districtsLE1, LE2, LE3, LE4, LE5
Homeowners reviewing extension elevation drawings and a 3D view on a tablet

Included in a typical project

  • Route recommendation in writing
  • Submission and fee payment guidance
  • Liaison with the planning officer
  • Planning history and constraints check for your address
  • Advice if conditions are attached or changes are requested
  • Application forms, plans and supporting statements

Design and approval fees for Leicester

Guide fees for Leicester including VAT, using our East Midlands factor of ×0.95. Council and building control charges are not included.

OptionWhat it coversGuide price
EssentialPermitted development confirmed in writing (certificate or notification)£300 – £650
StandardHouseholder planning application handled£550 – £1,050
PremiumApplication with heritage or design statements, and responses to the council£850 – £1,550

Our handling fee only. Council fees are extra: in England from 1 April 2026 a householder application is £548, a lawful development certificate for a proposed extension £274 and a larger home extension prior approval £249. Drawings are priced separately.

Want a range for your exact size? The guide-price tool takes about a minute.

Working in Leicester

We cover Leicester and the postcode districts LE1, LE2, LE3, LE4, LE5, LE7. Neighbouring towns we cover include Oadby (3 miles), Wigston (4 miles), Earl Shilton (9 miles), Loughborough (9 miles).

The East Midlands has plenty of inter-war and post-war semis and detached houses with room to extend, alongside Victorian terraces in the towns.

Do I need planning permission in Leicester?

In England the main routes are permitted development (ideally confirmed with a lawful development certificate, £274), larger home extension prior approval (£249, 42 days) and a householder planning application (£548, normally 8 weeks), with council fees as set from 1 April 2026.

In a conservation area, national park, National Landscape, the Broads or a World Heritage Site the permitted development limits are tighter (no side or two-storey extensions without an application). Listed homes need listed building consent, and if permitted development rights have been removed, any extension needs an application.

If the work involves a shared wall, building on the boundary, or digging foundations within 3 m (sometimes 6 m) of a neighbour's building, the Party Wall etc. Act 1996 applies and notice must be served before work starts: two months for work to a party wall, one month for new walls on the boundary and for excavations.

Building regulations approval is separate from planning. In England you can use the council's building control team or a registered building control approver; a full plans application gets the drawings checked before work starts, and the inspector signs the work off with a completion certificate.

Applications are decided by the local planning authority (your district, borough or unitary council).

Our process, step by step

Site visits are free and there is no obligation. Where drawings are needed, the design stage is priced in writing before it starts.

  1. Free site visit

    A designer visits, takes measurements and photos, and discusses layouts, budget and timing with you.

  2. Design and approvals

    We produce the drawings and structural design, and manage the approvals so they are in place before work starts.

  3. Fixed written price

    The price is fixed in writing once the design is settled, with a clear programme and payment stages.

  4. Build and sign-off

    The build is managed from start to finish, inspected at each stage and signed off on completion.

Questions answered

How long does this take for a Leicester home?

8–13 weeks typical decision period, depending on the council and the complexity of the project.

Do I need building regulations approval in Leicester?

Yes. Almost every extension needs it, whatever the planning route. We prepare the drawings and book the inspections.

Who do I contract with in Leicester?

Your contract is with S&K Property Investments and Improvement Ltd, which designs and manages the project and the build teams who carry it out.

How much does planning permission cost?

In England, from 1 April 2026 the council fee is £548 for a householder application, £274 for a lawful development certificate for a proposed extension and £249 for larger home extension prior approval. Our handling fee is separate.

What happens if planning is refused?

You can revise the design and reapply, or appeal. We read the officer’s report and tell you honestly which option has a better chance.

Book a free site visit in Leicester

We will measure up, check the planning position and give you honest guide figures.

  • Free, no-obligation site visit
  • Planning route checked before you spend on drawings
  • Written price once the design is agreed
  • Building control sign-off at the end

Prefer to talk? Call 0800 088 6341 or .

Book a free site visit

Tell us a little about the project and we will arrange a time.

Please enter a valid UK postcode.
Please choose an option.
Please enter your name.
Please enter a phone number.
Please enter a valid email.

We use your details only to reply to this enquiry and prepare your quote. Privacy notice.

Call usGet a quote