house-extension.uk

Planning permission for extensions in Coleraine

Need planning permission for extensions in Coleraine? We survey the house, prepare what the council needs and deal with the officers until a decision is made.

  • Guide price in ColeraineFrom £300 inc VAT
  • PlanningWe find the right route for you
  • Timescale8–13 weeks typical decision period
  • Postcode districtsBT52
Homeowners reviewing extension elevation drawings and a 3D view on a tablet

What it costs in Coleraine

These are guide fees for Coleraine, adjusted for Northern Ireland (×0.86) and including VAT. Council application and inspection fees are paid separately.

OptionWhat it coversGuide price
EssentialPermitted development confirmed in writing (certificate or notification)£300 – £600
StandardHouseholder planning application handled£500 – £950
PremiumApplication with heritage or design statements, and responses to the council£750 – £1,400

Our handling fee only. Council fees are extra and are set by the Northern Ireland Executive. Drawings are priced separately.

For a figure based on your own dimensions, use our guide-price tool.

Who this service is for

  • Anyone unsure whether their extension needs permission
  • Homeowners who would rather not deal with the council themselves
  • Projects in conservation areas or with previous refusals

A lawful development certificate is not compulsory for permitted development, but it is the cleanest proof that the extension was lawful when you come to sell. We usually recommend one.

Local to Coleraine

Site visits are available across Coleraine (BT52). Neighbouring towns we cover include Limavady (13 miles), Magherafelt (26 miles), Derry/Londonderry (27 miles).

In Northern Ireland, extension projects follow the NI planning rules and council building control, which we account for from the first survey.

Planning rules that apply in Coleraine

In Northern Ireland we check the permitted development limits for your house type and, where needed, apply to your council for planning permission, then submit full plans or a building notice to council building control.

The planning position for a specific Coleraine address depends on its history and any designations, which is why we check it at the first visit.

Northern Ireland has no Party Wall Act. Where work is on or close to a shared boundary, we agree access and protection with your neighbour in writing before work starts.

Building close to a public sewer needs the agreement of NI Water, which we check during design.

Applications are decided by your council, which handles local planning in Northern Ireland.

What happens next

Site visits are free and there is no obligation. Where drawings are needed, the design stage is priced in writing before it starts.

  1. Free site visit

    We visit your Coleraine home, measure up, talk through what you want and check the planning position.

  2. Design and approvals

    We produce the drawings and structural design, and manage the approvals so they are in place before work starts.

  3. Fixed written price

    The price is fixed in writing once the design is settled, with a clear programme and payment stages.

  4. Build and sign-off

    The build is managed from start to finish, inspected at each stage and signed off on completion.

Questions answered

Do I need building regulations approval in Coleraine?

Yes. Almost every extension needs it, whatever the planning route. We prepare the drawings and book the inspections.

Can I see a price before committing to anything?

Yes. The guide prices on this page are adjusted for Coleraine, and the guide-price tool gives a range for your own size. After the survey you get a written price before anything is agreed.

How long does this take for a Coleraine home?

8–13 weeks typical decision period, depending on the council and the complexity of the project.

What happens if planning is refused?

You can revise the design and reapply, or appeal. We read the officer’s report and tell you honestly which option has a better chance.

Book a free site visit in Coleraine

We will measure up, check the planning position and give you honest guide figures.

  • Free, no-obligation site visit
  • Planning route checked before you spend on drawings
  • Written price once the design is agreed
  • Building control sign-off at the end

Prefer to talk? Call 0800 088 6341 or .

Book a free site visit

Tell us a little about the project and we will arrange a time.

Please enter a valid UK postcode.
Please choose an option.
Please enter your name.
Please enter a phone number.
Please enter a valid email.

We use your details only to reply to this enquiry and prepare your quote. Privacy notice.

Call usGet a quote