house-extension.uk

Building regulations for extensions in Stornoway

Stornoway projects are quoted by arrangement: we plan the design, approvals and build carefully around travel and material deliveries, and confirm any travel costs up front.

  • Guide price in StornowayFrom £850 inc VAT
  • Approval routeBuilding warrant before work starts
  • Timescale2–5 weeks for drawings
  • Postcode districtsHS1
Builder installing a steel beam over a new rear opening on acrow props

Extensions in and around Stornoway

We cover Stornoway and the postcode districts HS1. Island and remote projects are planned individually, with travel, deliveries and accommodation for the team agreed before the survey.

Across Scotland, extensions follow Scottish planning and building standards, including the building warrant process, which we build into the programme from the start.

Planning rules that apply in Stornoway

In Scotland a building warrant from the council is needed before work starts on almost any extension, and a completion certificate is issued when the work is accepted. Building standards are set in the Scottish technical handbooks.

The planning position for a specific Stornoway address depends on its history and any designations, which is why we check it at the first visit.

Building close to a public sewer needs the agreement of Scottish Water, which we check during design.

Scotland has no Party Wall Act. Where work affects a shared wall or a neighbour's land, we agree access, protection and making good with your neighbour in writing before work starts.

Applications are decided by your council as planning authority.

What we take care of

  • Energy and glazing checks, including whole-house calculations if needed
  • Structural calculations for beams, lintels and foundations
  • Building regulations drawings and written specification
  • Completion certificate on sign-off
  • Inspection bookings throughout the build

Fees in Stornoway

Guide fees for Stornoway including VAT, using our Scotland factor of ×0.98. Council and building control charges are not included.

OptionWhat it coversGuide price
EssentialBuilding regulations drawings for a simple single-storey extension£850 – £1,800
StandardDrawings plus structural calculations£1,250 – £2,550
PremiumComplex or two-storey pack with energy calculations£2,150 – £3,750

Our design fee only. Building control charges are set by your council (or, in England and Wales, a registered building control approver) and quoted separately.Council fees are extra and are set by the Scottish Government.

For a figure based on your own dimensions, use our guide-price tool.

What happens next

Visits to Stornoway are arranged around travel; we confirm any travel costs in writing before the survey.

  1. Site visit by arrangement

    First, a site visit: we look at the house, garden, access and drains and listen to what you need.

  2. Design and approvals

    We draw the design, agree it with you and handle planning or permitted development checks and building regulations.

  3. Fixed written price

    With the design and specification agreed, you get a fixed written price and a start date.

  4. Build and sign-off

    The build is managed from start to finish, inspected at each stage and signed off on completion.

Questions answered

Who do I contract with in Stornoway?

Your contract is with S&K Property Investments and Improvement Ltd, which designs and manages the project and the build teams who carry it out.

Will my neighbours in Stornoway be involved?

If a planning application is needed, the council notifies neighbours. Where work is close to a shared boundary, we agree access and protection with them in writing.

How long does this take for a Stornoway home?

2–5 weeks for drawings, depending on the council and the complexity of the project.

Talk to us about a project in Stornoway

We will talk through the project, the planning position and how we would organise the visit and the build.

  • Site visit arranged around travel, costs agreed first
  • Planning route checked before you spend on drawings
  • Written price once the design is agreed
  • Building control sign-off at the end

Prefer to talk? Call 0800 088 6341 or .

Send us your project details

Tell us a little about the project and we will arrange a time.

Please enter a valid UK postcode.
Please choose an option.
Please enter your name.
Please enter a phone number.
Please enter a valid email.

We use your details only to reply to this enquiry and prepare your quote. Privacy notice.

Call usGet a quote