Building regulations for extensions across Prescot
For Prescot homeowners we handle building regulations for extensions, with fees agreed in writing before any work starts.
- Guide price in PrescotFrom £850 inc VAT
- Approval routeFull plans or building notice
- Timescale2–5 weeks for drawings
- Postcode districtsL28, L34, L35, L36, WA10

When it helps
- Every extension, whatever the planning route
- Glass-heavy designs that need energy calculations
- Homeowners using their own builder who need the drawings
Working in Prescot
Site visits are available across Prescot (L28, L34, L35, L36, WA10). The same team covers Huyton (2 miles), St Helens (3 miles), Halewood (5 miles), Kirkby (5 miles), all within easy reach.
Widnes, in Cheshire, is roughly 5 miles from Prescot and also on our list. The North West has a high share of Victorian and Edwardian terraces with rear yards and outriggers, plus large areas of inter-war semis in the suburbs.
Design and approval fees for Prescot
Guide fees for Prescot including VAT, using our North West England factor of ×0.95. Council and building control charges are not included.
| Option | What it covers | Guide price |
|---|---|---|
| Essential | Building regulations drawings for a simple single-storey extension | £850 – £1,750 |
| Standard | Drawings plus structural calculations | £1,200 – £2,500 |
| Premium | Complex or two-storey pack with energy calculations | £2,050 – £3,650 |
Our design fee only. Building control charges are set by your council (or, in England and Wales, a registered building control approver) and quoted separately.
Try the guide-price tool to see a range for your own size and finish.
Planning and approvals in Prescot
Building regulations approval is separate from planning. In England you can use the council's building control team or a registered building control approver; a full plans application gets the drawings checked before work starts, and the inspector signs the work off with a completion certificate.
The planning position for a specific Prescot address depends on its history and any designations, which is why we check it at the first visit.
If the work involves a shared wall, building on the boundary, or digging foundations within 3 m (sometimes 6 m) of a neighbour's building, the Party Wall etc. Act 1996 applies and notice must be served before work starts: two months for work to a party wall, one month for new walls on the boundary and for excavations.
Applications are decided by the local planning authority (your district, borough or unitary council).
How the project works
Site visits are free and there is no obligation. Where drawings are needed, the design stage is priced in writing before it starts.
Free site visit
A designer visits, takes measurements and photos, and discusses layouts, budget and timing with you.
Design and approvals
Drawings are prepared and agreed with you, then submitted for the right planning route and building regulations approval.
Fixed written price
We confirm the build price in writing, based on the approved drawings and the finishes you have chosen.
Build and sign-off
The build is managed from start to finish, inspected at each stage and signed off on completion.
Common questions in Prescot
Will my neighbours in Prescot be involved?
If a planning application or prior approval is needed, the council notifies neighbours. If the work is on or near a shared boundary, party wall notices may also be needed.
Do you cover all of Prescot?
Yes. We cover Prescot and the surrounding parts of Merseyside. Site visits are free and there is no obligation.
Can I see a price before committing to anything?
Yes. The guide prices on this page are adjusted for Prescot, and the guide-price tool gives a range for your own size. After the survey you get a written price before anything is agreed.
Full plans or building notice?
A full plans application gets the drawings checked before work starts, which we usually recommend for extensions. A building notice is quicker to submit but carries more risk if something needs changing on site.
What are the insulation standards for an extension?
In England, new walls in an extension should achieve a U-value of 0.18 W/m²K, roofs 0.15 and floors 0.18, with windows at 1.4 and rooflights at 2.2. Wales, Scotland and Northern Ireland set their own figures.
Book a free site visit in Prescot
We will measure up, check the planning position and give you honest guide figures.
- Free, no-obligation site visit
- Planning route checked before you spend on drawings
- Written price once the design is agreed
- Building control sign-off at the end
Prefer to talk? Call 0800 088 6341 or .
Book a free site visit
Tell us a little about the project and we will arrange a time.