Prescot glass extensions, designed and built
Prescot homeowners can use us for the whole glass extension project: survey, design, planning or permitted development checks, building regulations and the build itself.
- Guide price in PrescotFrom £28,500 inc VAT
- PlanningSame limits as single-storey rear; glazing checked for building regs
- Build time10–16 weeks on site
- Postcode districtsL28, L34, L35, L36, WA10

How much does a glass extension cost in Prescot?
Prices below are for Prescot, using the North West England factor of ×0.95. They are guide ranges including VAT for the build only, not a quote.
Typical rates in Prescot: £2,850 to £5,510 per m² including VAT, depending on specification.
| Size | Essential | Standard | Premium |
|---|---|---|---|
| 2 m × 4 m 8 m² | £28,500 – £34,500 | £28,500 – £36,000 | £32,500 – £44,500 |
| 3 m × 4 m 12 m² | £34,000 – £41,500 | £39,500 – £50,500 | £49,000 – £66,500 |
| 3 m × 6 m 18 m² | £51,000 – £62,000 | £59,500 – £75,500 | £73,500 – £99,500 |
Want a range for your exact size? The guide-price tool takes about a minute.
Extensions in and around Prescot
Site visits are available across Prescot (L28, L34, L35, L36, WA10). We also work in nearby Huyton (2 miles), St Helens (3 miles), Halewood (5 miles), Kirkby (5 miles).
The North West has a high share of Victorian and Edwardian terraces with rear yards and outriggers, plus large areas of inter-war semis in the suburbs.
When a glass extension makes sense
- Period and listed-style houses where a light touch is wanted
- Garden-facing dining rooms
- Small infill spaces and side returns
Do I need planning permission in Prescot?
In England a glazed or orangery-style extension follows the same size limits as any single-storey rear extension: 3 m or 4 m without an application, or up to 6 m and 8 m through prior approval. Building regulations limit glazing to about a quarter of the new floor area plus the openings it replaces, unless whole-house calculations show the design still performs.
In a conservation area, national park, National Landscape, the Broads or a World Heritage Site the permitted development limits are tighter (no side or two-storey extensions without an application). Listed homes need listed building consent, and if permitted development rights have been removed, any extension needs an application.
If the work involves a shared wall, building on the boundary, or digging foundations within 3 m (sometimes 6 m) of a neighbour's building, the Party Wall etc. Act 1996 applies and notice must be served before work starts: two months for work to a party wall, one month for new walls on the boundary and for excavations.
Building regulations approval is separate from planning. In England you can use the council's building control team or a registered building control approver; a full plans application gets the drawings checked before work starts, and the inspector signs the work off with a completion certificate.
Applications are decided by the local planning authority (your district, borough or unitary council).
Our process, step by step
Site visits are free and there is no obligation. Where drawings are needed, the design stage is priced in writing before it starts.
Free site visit
We visit your Prescot home, measure up, talk through what you want and check the planning position.
Design and approvals
Drawings are prepared and agreed with you, then submitted for the right planning route and building regulations approval.
Fixed written price
The price is fixed in writing once the design is settled, with a clear programme and payment stages.
Build and sign-off
The build is managed from start to finish, inspected at each stage and signed off on completion.
Glass extension questions answered
Who do I contract with for a glass extension in Prescot?
Your contract is with S&K Property Investments and Improvement Ltd, which designs and manages the project and the build teams who carry it out.
Do I need building regulations approval in Prescot?
Yes. Almost every extension needs it, whatever the planning route. We prepare the drawings and book the inspections.
How long does a glass extension take to build in Prescot?
On site, typically 10 to 16 weeks once approvals are in place. Before that, allow 8–14 weeks design and approvals.
How much does a glass extension cost?
Our guide range is about £2,850 to £5,510 per m² including VAT, because structural glass is made to order. A 12 m² standard-spec glass extension is typically £39,500 to £50,500 in Prescot.
Are glass extensions cold in winter?
Modern double or triple glazing with warm-edge spacers and underfloor heating keeps them comfortable. They are not as warm as a solid room, and we explain the trade-off honestly.
Book a free site visit in Prescot
We will measure up, check the planning position and give you honest guide figures.
- Free, no-obligation site visit
- Planning route checked before you spend on drawings
- Written price once the design is agreed
- Building control sign-off at the end
Prefer to talk? Call 0800 088 6341 or .
Book a free site visit
Tell us a little about the project and we will arrange a time.