Building regulations for extensions across Paisley
For Paisley homeowners we handle the building warrant for extensions, with fees agreed in writing before any work starts.
- Guide price in PaisleyFrom £850 inc VAT
- Approval routeBuilding warrant before work starts
- Timescale2–5 weeks for drawings
- Postcode districtsG78, PA1, PA2, PA3, PA4

When it helps
- Homeowners using their own builder who need the drawings
- Glass-heavy designs that need energy calculations
- Every extension, whatever the planning route
Building regulations approval and planning permission are separate. A design can have planning consent and still need changes to meet the regulations, which is why we draw for both together.
Extensions in and around Paisley
Our survey diary covers Paisley, including G78, PA1, PA2, PA3, PA4, PA5. Neighbouring towns we cover include Barrhead (3 miles), Renfrew (3 miles), Johnstone (3 miles), Erskine (5 miles).
For homes towards Dunbartonshire, Clydebank is around 5 miles away. Across Scotland, extensions follow Scottish planning and building standards, including the building warrant process, which we build into the programme from the start.
Fees in Paisley
Fees below are our Paisley guide (×0.98, the Scotland factor), including VAT. Council and building control fees are extra.
| Option | What it covers | Guide price |
|---|---|---|
| Essential | Building regulations drawings for a simple single-storey extension | £850 – £1,800 |
| Standard | Drawings plus structural calculations | £1,250 – £2,550 |
| Premium | Complex or two-storey pack with energy calculations | £2,150 – £3,750 |
Our design fee only. Building control charges are set by your council (or, in England and Wales, a registered building control approver) and quoted separately.Council fees are extra and are set by the Scottish Government.
Want a range for your exact size? The guide-price tool takes about a minute.
Planning and approvals in Paisley
In Scotland a building warrant from the council is needed before work starts on almost any extension, and a completion certificate is issued when the work is accepted. Building standards are set in the Scottish technical handbooks.
In a conservation area or national scenic area the householder permitted development rights are more limited, listed homes need listed building consent, and if rights have been removed by a condition or direction, any extension needs an application.
Scotland has no Party Wall Act. Where work affects a shared wall or a neighbour's land, we agree access, protection and making good with your neighbour in writing before work starts.
Building close to a public sewer needs the agreement of Scottish Water, which we check during design.
Applications are decided by your council as planning authority.
Our process, step by step
Site visits are free and there is no obligation. Where drawings are needed, the design stage is priced in writing before it starts.
Free site visit
A designer visits, takes measurements and photos, and discusses layouts, budget and timing with you.
Design and approvals
Drawings are prepared and agreed with you, then submitted for the right planning route and building regulations approval.
Fixed written price
With the design and specification agreed, you get a fixed written price and a start date.
Build and sign-off
The build is managed from start to finish, inspected at each stage and signed off on completion.
Questions answered
Will my neighbours in Paisley be involved?
If a planning application is needed, the council notifies neighbours. Where work is close to a shared boundary, we agree access and protection with them in writing.
Who do I contract with in Paisley?
Your contract is with S&K Property Investments and Improvement Ltd, which designs and manages the project and the build teams who carry it out.
How long does this take for a Paisley home?
2–5 weeks for drawings, depending on the council and the complexity of the project.
Book a free site visit in Paisley
We will measure up, check the planning position and give you honest guide figures.
- Free, no-obligation site visit
- Planning route checked before you spend on drawings
- Written price once the design is agreed
- Building control sign-off at the end
Prefer to talk? Call 0800 088 6341 or .
Book a free site visit
Tell us a little about the project and we will arrange a time.