Building regulations for extensions in Johnstone
We prepare the building warrant for extensions for homes in Johnstone, as a stand-alone service or as the first stage of a design and build project.
- Guide price in JohnstoneFrom £850 inc VAT
- Approval routeBuilding warrant before work starts
- Timescale2–5 weeks for drawings
- Postcode districtsPA5, PA10

Planning rules that apply in Johnstone
In Scotland a building warrant from the council is needed before work starts on almost any extension, and a completion certificate is issued when the work is accepted. Building standards are set in the Scottish technical handbooks.
Before any drawing is finalised we check whether the house is listed, in a conservation area or subject to an Article 4 direction.
Scotland has no Party Wall Act. Where work affects a shared wall or a neighbour's land, we agree access, protection and making good with your neighbour in writing before work starts.
Applications are decided by your council as planning authority.
Covering Johnstone
Postcode districts we cover around Johnstone include PA5, PA10. Nearby, we also take on projects in Paisley (3 miles), Barrhead (5 miles), Erskine (6 miles), Renfrew (6 miles).
Scotland's housing includes sandstone villas, terraces and tenements in the cities and plenty of post-war and modern houses and bungalows elsewhere. A building warrant is needed before work starts.
What it costs in Johnstone
These are guide fees for Johnstone, adjusted for Scotland (×0.98) and including VAT. Council application and inspection fees are paid separately.
| Option | What it covers | Guide price |
|---|---|---|
| Essential | Building regulations drawings for a simple single-storey extension | £850 – £1,800 |
| Standard | Drawings plus structural calculations | £1,250 – £2,550 |
| Premium | Complex or two-storey pack with energy calculations | £2,150 – £3,750 |
Our design fee only. Building control charges are set by your council (or, in England and Wales, a registered building control approver) and quoted separately.Council fees are extra and are set by the Scottish Government.
Want a range for your exact size? The guide-price tool takes about a minute.
When it helps
- Homeowners using their own builder who need the drawings
- Every extension, whatever the planning route
- Glass-heavy designs that need energy calculations
How the project works
Site visits are free and there is no obligation. Where drawings are needed, the design stage is priced in writing before it starts.
Free site visit
It starts with a visit to your house to measure, check access and talk through ideas and budget.
Design and approvals
We produce the drawings and structural design, and manage the approvals so they are in place before work starts.
Fixed written price
We confirm the build price in writing, based on the approved drawings and the finishes you have chosen.
Build and sign-off
The build is managed from start to finish, inspected at each stage and signed off on completion.
Common questions in Johnstone
How long does this take for a Johnstone home?
2–5 weeks for drawings, depending on the council and the complexity of the project.
Do I need building regulations approval in Johnstone?
Yes. Almost every extension needs it, whatever the planning route. In Scotland that means a building warrant before work starts.
Who do I contract with in Johnstone?
Your contract is with S&K Property Investments and Improvement Ltd, which designs and manages the project and the build teams who carry it out.
Book a free site visit in Johnstone
We will measure up, check the planning position and give you honest guide figures.
- Free, no-obligation site visit
- Planning route checked before you spend on drawings
- Written price once the design is agreed
- Building control sign-off at the end
Prefer to talk? Call 0800 088 6341 or .
Book a free site visit
Tell us a little about the project and we will arrange a time.