Building regulations for extensions across Nuneaton
We prepare building regulations for extensions for homes in Nuneaton, as a stand-alone service or as the first stage of a design and build project.
- Guide price in NuneatonFrom £850 inc VAT
- Approval routeFull plans or building notice
- Timescale2–5 weeks for drawings
- Postcode districtsCV10, CV11, CV12

Will the council need to approve it?
Building regulations approval is separate from planning. In England you can use the council's building control team or a registered building control approver; a full plans application gets the drawings checked before work starts, and the inspector signs the work off with a completion certificate.
Homes in conservation areas, national parks, National Landscapes (formerly AONBs), the Broads and World Heritage Sites have tighter rules, so we always check the property's status and planning history before design starts.
If the work involves a shared wall, building on the boundary, or digging foundations within 3 m (sometimes 6 m) of a neighbour's building, the Party Wall etc. Act 1996 applies and notice must be served before work starts: two months for work to a party wall, one month for new walls on the boundary and for excavations.
Applications are decided by the local planning authority (your district, borough or unitary council).
Design and approval fees for Nuneaton
Fees below are our Nuneaton guide (×0.97, the West Midlands factor), including VAT. Council and building control fees are extra.
| Option | What it covers | Guide price |
|---|---|---|
| Essential | Building regulations drawings for a simple single-storey extension | £850 – £1,750 |
| Standard | Drawings plus structural calculations | £1,250 – £2,550 |
| Premium | Complex or two-storey pack with energy calculations | £2,100 – £3,700 |
Our design fee only. Building control charges are set by your council (or, in England and Wales, a registered building control approver) and quoted separately.
For a figure based on your own dimensions, use our guide-price tool.
When it helps
- Homeowners using their own builder who need the drawings
- Every extension, whatever the planning route
- Glass-heavy designs that need energy calculations
Building regulations approval and planning permission are separate. A design can have planning consent and still need changes to meet the regulations, which is why we draw for both together.
Working in Nuneaton
Site visits are available across Nuneaton (CV10, CV11, CV12). The same team covers Bedworth (3 miles), Atherstone (6 miles), Kenilworth (13 miles), Rugby (14 miles), all within easy reach.
Hinckley, in Leicestershire, is roughly 4 miles from Nuneaton and also on our list. The West Midlands has a large stock of 1930s and post-war semi-detached houses, which are well suited to rear, side and over-garage extensions, plus Victorian terraces in the older inner areas.
Our process, step by step
Site visits are free and there is no obligation. Where drawings are needed, the design stage is priced in writing before it starts.
Free site visit
First, a site visit: we look at the house, garden, access and drains and listen to what you need.
Design and approvals
We produce the drawings and structural design, and manage the approvals so they are in place before work starts.
Fixed written price
We confirm the build price in writing, based on the approved drawings and the finishes you have chosen.
Build and sign-off
Our team builds the extension, keeps you updated weekly and finishes with building control sign-off.
Questions answered
Do you cover all of Nuneaton?
Yes. We cover Nuneaton and the surrounding parts of Warwickshire. Site visits are free and there is no obligation.
Can I see a price before committing to anything?
Yes. The guide prices on this page are adjusted for Nuneaton, and the guide-price tool gives a range for your own size. After the survey you get a written price before anything is agreed.
Will my neighbours in Nuneaton be involved?
If a planning application or prior approval is needed, the council notifies neighbours. If the work is on or near a shared boundary, party wall notices may also be needed.
Who are building control?
Either your local council’s building control team or a registered building control approver. Both inspect the work and issue the completion certificate.
What are the insulation standards for an extension?
In England, new walls in an extension should achieve a U-value of 0.18 W/m²K, roofs 0.15 and floors 0.18, with windows at 1.4 and rooflights at 2.2. Wales, Scotland and Northern Ireland set their own figures.
Book a free site visit in Nuneaton
We will measure up, check the planning position and give you honest guide figures.
- Free, no-obligation site visit
- Planning route checked before you spend on drawings
- Written price once the design is agreed
- Building control sign-off at the end
Prefer to talk? Call 0800 088 6341 or .
Book a free site visit
Tell us a little about the project and we will arrange a time.