Building regulations for extensions in Norfolk
We prepare building regulations for extensions for homes across Norfolk, on their own or as the first stage of a full design and build project.
- Guide priceFrom £950 inc VAT
- Approval routeFull plans or building notice
- Towns covered8
- Site visitFree, no obligation

Working in Norfolk
Towns we cover in Norfolk include Norwich, Great Yarmouth, King's Lynn, Thetford, Dereham, Wymondham, Cromer, North Walsham. Across the East of England many houses sit on generous plots, and single-storey and wraparound extensions are a natural fit.
Planning rules that apply in Norfolk
Building regulations approval is separate from planning. In England you can use the council's building control team or a registered building control approver; a full plans application gets the drawings checked before work starts, and the inspector signs the work off with a completion certificate.
Homes in conservation areas, national parks, National Landscapes (formerly AONBs), the Broads and World Heritage Sites have tighter rules, so we always check the property's status and planning history before design starts.
If the work involves a shared wall, building on the boundary, or digging foundations within 3 m (sometimes 6 m) of a neighbour's building, the Party Wall etc. Act 1996 applies and notice must be served before work starts: two months for work to a party wall, one month for new walls on the boundary and for excavations.
Applications are decided by the local planning authority (your district, borough or unitary council).
Design and approval fees for Norfolk
Fees below are our Norfolk guide (×1.06, the East of England factor), including VAT. Council and building control fees are extra.
| Option | What it covers | Guide price |
|---|---|---|
| Essential | Building regulations drawings for a simple single-storey extension | £950 – £1,950 |
| Standard | Drawings plus structural calculations | £1,350 – £2,800 |
| Premium | Complex or two-storey pack with energy calculations | £2,300 – £4,050 |
Our design fee only. Building control charges are set by your council (or, in England and Wales, a registered building control approver) and quoted separately.
Try the guide-price tool to see a range for your own size and finish.
Who this service is for
- Glass-heavy designs that need energy calculations
- Homeowners using their own builder who need the drawings
- Every extension, whatever the planning route
Building regulations approval and planning permission are separate. A design can have planning consent and still need changes to meet the regulations, which is why we draw for both together.
How the project works
Site visits are free and there is no obligation. Where drawings are needed, the design stage is priced in writing before it starts.
Free site visit
First, a site visit: we look at the house, garden, access and drains and listen to what you need.
Design and approvals
Once the layout is agreed, we deal with the council: planning permission or written confirmation that none is needed, plus building control.
Fixed written price
The price is fixed in writing once the design is settled, with a clear programme and payment stages.
Build and sign-off
Work is carried out to the agreed programme, inspected by building control and signed off at the end.
Common questions in Norfolk
Do you cover all of Norfolk?
Yes, across the whole of Norfolk. Site visits are free and there is no obligation.
Can I see a price before committing to anything?
Yes. The guide prices on this page are adjusted for Norfolk, and the guide-price tool gives a range for your own size. After the survey you get a written price before anything is agreed.
Do I need building regulations approval in Norfolk?
Yes. Almost every extension needs it, whatever the planning route. We prepare the drawings and book the inspections.
What are the insulation standards for an extension?
In England, new walls in an extension should achieve a U-value of 0.18 W/m²K, roofs 0.15 and floors 0.18, with windows at 1.4 and rooflights at 2.2. Wales, Scotland and Northern Ireland set their own figures.
Full plans or building notice?
A full plans application gets the drawings checked before work starts, which we usually recommend for extensions. A building notice is quicker to submit but carries more risk if something needs changing on site.
Book a free site visit in Norfolk
We will measure up, check the planning position and give you honest guide figures.
- Free, no-obligation site visit
- Planning route checked before you spend on drawings
- Written price once the design is agreed
- Building control sign-off at the end
Prefer to talk? Call 0800 088 6341 or .
Book a free site visit
Tell us a little about the project and we will arrange a time.