Building regulations for extensions across Neath
For Neath homeowners we handle building regulations for extensions, with fees agreed in writing before any work starts.
- Guide price in NeathFrom £800 inc VAT
- Approval routeFull plans or building notice
- Timescale2–5 weeks for drawings
- Postcode districtsSA10, SA11

What it costs in Neath
Fees below are our Neath guide (×0.93, the Wales factor), including VAT. Council and building control fees are extra.
| Option | What it covers | Guide price |
|---|---|---|
| Essential | Building regulations drawings for a simple single-storey extension | £800 – £1,700 |
| Standard | Drawings plus structural calculations | £1,200 – £2,450 |
| Premium | Complex or two-storey pack with energy calculations | £2,000 – £3,550 |
Our design fee only. Building control charges are set by your council (or, in England and Wales, a registered building control approver) and quoted separately.Council fees are extra and are set by the Welsh Government.
Want a range for your exact size? The guide-price tool takes about a minute.
Who this service is for
- Homeowners using their own builder who need the drawings
- Every extension, whatever the planning route
- Glass-heavy designs that need energy calculations
Extensions in and around Neath
Site visits are available across Neath (SA10, SA11). Neighbouring towns we cover include Briton Ferry (2 miles), Clydach (4 miles), Swansea (7 miles), Gorseinon (10 miles).
For homes towards Mid Glamorgan, Maesteg is around 7 miles away. Welsh housing ranges from stone terraces in the valleys to render-and-slate houses and modern estates, and the Welsh planning rules differ from England's in several places.
Will the council need to approve it?
Building regulations approval is separate from planning. Wales has its own building regulations and approved documents; the council or a registered building control approver checks the plans, inspects the work and issues a completion certificate.
Homes in conservation areas, national parks, National Landscapes (AONBs) and World Heritage Sites have tighter rules, so we always check the property's status and planning history before design starts.
Building over or within 3 m of a public sewer needs the water company's consent before the foundations go in.
The Party Wall etc. Act 1996 applies in Wales as in England: notice must be served before work to a shared wall, building on the boundary, or excavating close to a neighbour's foundations.
Applications are decided by the local planning authority (your county or county borough council, or the national park authority).
From first visit to completion
Site visits are free and there is no obligation. Where drawings are needed, the design stage is priced in writing before it starts.
Free site visit
We visit your Neath home, measure up, talk through what you want and check the planning position.
Design and approvals
We produce the drawings and structural design, and manage the approvals so they are in place before work starts.
Fixed written price
With the design and specification agreed, you get a fixed written price and a start date.
Build and sign-off
We build it with one project manager, book the building control inspections and hand over the completion certificate.
Common questions in Neath
Do I need building regulations approval in Neath?
Yes. Almost every extension needs it, whatever the planning route. We prepare the drawings and book the inspections.
Will my neighbours in Neath be involved?
If a planning application is needed, the council notifies neighbours. If the work is on or near a shared boundary, party wall notices may also be needed.
Do you cover all of Neath?
Yes. We cover Neath and the surrounding parts of West Glamorgan. Site visits are free and there is no obligation.
Who are building control?
Either your local council’s building control team or a registered building control approver. Both inspect the work and issue the completion certificate.
Full plans or building notice?
A full plans application gets the drawings checked before work starts, which we usually recommend for extensions. A building notice is quicker to submit but carries more risk if something needs changing on site.
Book a free site visit in Neath
We will measure up, check the planning position and give you honest guide figures.
- Free, no-obligation site visit
- Planning route checked before you spend on drawings
- Written price once the design is agreed
- Building control sign-off at the end
Prefer to talk? Call 0800 088 6341 or .
Book a free site visit
Tell us a little about the project and we will arrange a time.