Building regulations for extensions across Morley
We prepare building regulations for extensions for homes in Morley, as a stand-alone service or as the first stage of a design and build project.
- Guide price in MorleyFrom £800 inc VAT
- Approval routeFull plans or building notice
- Timescale2–5 weeks for drawings
- Postcode districtsBD11, LS10, LS11, LS27, WF3

What is included
- Building regulations drawings and written specification
- Inspection bookings throughout the build
- Energy and glazing checks, including whole-house calculations if needed
- Completion certificate on sign-off
- Structural calculations for beams, lintels and foundations
Covering Morley
Site visits are available across Morley (BD11, LS10, LS11, LS27, WF3, WF17). Neighbouring towns we cover include Batley (3 miles), Dewsbury (4 miles), Heckmondwike (4 miles), Ossett (4 miles).
Just over the South Yorkshire border, Darton is about 11 miles away. Homes across Yorkshire and the Humber range from back-to-back and through terraces to large suburban semis, and extension options vary with them.
What it costs in Morley
These are guide fees for Morley, adjusted for Yorkshire and the Humber (×0.94) and including VAT. Council application and inspection fees are paid separately.
| Option | What it covers | Guide price |
|---|---|---|
| Essential | Building regulations drawings for a simple single-storey extension | £800 – £1,700 |
| Standard | Drawings plus structural calculations | £1,200 – £2,450 |
| Premium | Complex or two-storey pack with energy calculations | £2,050 – £3,600 |
Our design fee only. Building control charges are set by your council (or, in England and Wales, a registered building control approver) and quoted separately.
Want a range for your exact size? The guide-price tool takes about a minute.
Planning and approvals in Morley
Building regulations approval is separate from planning. In England you can use the council's building control team or a registered building control approver; a full plans application gets the drawings checked before work starts, and the inspector signs the work off with a completion certificate.
The planning position for a specific Morley address depends on its history and any designations, which is why we check it at the first visit.
If the work involves a shared wall, building on the boundary, or digging foundations within 3 m (sometimes 6 m) of a neighbour's building, the Party Wall etc. Act 1996 applies and notice must be served before work starts: two months for work to a party wall, one month for new walls on the boundary and for excavations.
Building over or within 3 m of a public sewer needs the water company's consent, usually through a build-over agreement, before the foundations go in.
Applications are decided by the local planning authority (your district, borough or unitary council).
What happens next
Site visits are free and there is no obligation. Where drawings are needed, the design stage is priced in writing before it starts.
Free site visit
A designer visits, takes measurements and photos, and discusses layouts, budget and timing with you.
Design and approvals
We draw the design, agree it with you and handle planning or permitted development checks and building regulations.
Fixed written price
With the design and specification agreed, you get a fixed written price and a start date.
Build and sign-off
Our team builds the extension, keeps you updated weekly and finishes with building control sign-off.
Common questions in Morley
Can I see a price before committing to anything?
Yes. The guide prices on this page are adjusted for Morley, and the guide-price tool gives a range for your own size. After the survey you get a written price before anything is agreed.
Do you cover all of Morley?
Yes. We cover Morley and the surrounding parts of West Yorkshire. Site visits are free and there is no obligation.
Who do I contract with in Morley?
Your contract is with S&K Property Investments and Improvement Ltd, which designs and manages the project and the build teams who carry it out.
Who are building control?
Either your local council’s building control team or a registered building control approver. Both inspect the work and issue the completion certificate.
What are the insulation standards for an extension?
In England, new walls in an extension should achieve a U-value of 0.18 W/m²K, roofs 0.15 and floors 0.18, with windows at 1.4 and rooflights at 2.2. Wales, Scotland and Northern Ireland set their own figures.
Book a free site visit in Morley
We will measure up, check the planning position and give you honest guide figures.
- Free, no-obligation site visit
- Planning route checked before you spend on drawings
- Written price once the design is agreed
- Building control sign-off at the end
Prefer to talk? Call 0800 088 6341 or .
Book a free site visit
Tell us a little about the project and we will arrange a time.