house-extension.uk

Building regulations for extensions in Kingswood

Need building regulations for extensions in Kingswood? We survey the house, prepare what the council needs and deal with the officers until a decision is made.

  • Guide price in KingswoodFrom £900 inc VAT
  • Approval routeFull plans or building notice
  • Timescale2–5 weeks for drawings
  • Postcode districtsBS15, BS16, BS30
Builder installing a steel beam over a new rear opening on acrow props

Included in a typical project

  • Submission to the council or a registered building control approver
  • Energy and glazing checks, including whole-house calculations if needed
  • Inspection bookings throughout the build
  • Structural calculations for beams, lintels and foundations

Building regulations approval and planning permission are separate. A design can have planning consent and still need changes to meet the regulations, which is why we draw for both together.

Fees in Kingswood

Fees below are our Kingswood guide (×1.02, the South West England factor), including VAT. Council and building control fees are extra.

OptionWhat it coversGuide price
EssentialBuilding regulations drawings for a simple single-storey extension£900 – £1,850
StandardDrawings plus structural calculations£1,300 – £2,700
PremiumComplex or two-storey pack with energy calculations£2,200 – £3,900

Our design fee only. Building control charges are set by your council (or, in England and Wales, a registered building control approver) and quoted separately.

Try the guide-price tool to see a range for your own size and finish.

Extensions in and around Kingswood

We cover Kingswood and the postcode districts BS15, BS16, BS30. Nearby, we also take on projects in Mangotsfield (2 miles), Yate (7 miles), Thornbury (10 miles), Dursley (18 miles).

In the South West, local stone, render and brick vary from town to town, so matching materials is a big part of designing an extension that looks right.

Planning rules that apply in Kingswood

Building regulations approval is separate from planning. In England you can use the council's building control team or a registered building control approver; a full plans application gets the drawings checked before work starts, and the inspector signs the work off with a completion certificate.

In a conservation area, national park, National Landscape, the Broads or a World Heritage Site the permitted development limits are tighter (no side or two-storey extensions without an application). Listed homes need listed building consent, and if permitted development rights have been removed, any extension needs an application.

Building over or within 3 m of a public sewer needs the water company's consent, usually through a build-over agreement, before the foundations go in.

If the work involves a shared wall, building on the boundary, or digging foundations within 3 m (sometimes 6 m) of a neighbour's building, the Party Wall etc. Act 1996 applies and notice must be served before work starts: two months for work to a party wall, one month for new walls on the boundary and for excavations.

Applications are decided by the local planning authority (your district, borough or unitary council).

What happens next

Site visits are free and there is no obligation. Where drawings are needed, the design stage is priced in writing before it starts.

  1. Free site visit

    A designer visits, takes measurements and photos, and discusses layouts, budget and timing with you.

  2. Design and approvals

    We draw the design, agree it with you and handle planning or permitted development checks and building regulations.

  3. Fixed written price

    The price is fixed in writing once the design is settled, with a clear programme and payment stages.

  4. Build and sign-off

    Work is carried out to the agreed programme, inspected by building control and signed off at the end.

Questions answered

Who do I contract with in Kingswood?

Your contract is with S&K Property Investments and Improvement Ltd, which designs and manages the project and the build teams who carry it out.

Will my neighbours in Kingswood be involved?

If a planning application or prior approval is needed, the council notifies neighbours. If the work is on or near a shared boundary, party wall notices may also be needed.

Do I need building regulations approval in Kingswood?

Yes. Almost every extension needs it, whatever the planning route. We prepare the drawings and book the inspections.

Who are building control?

Either your local council’s building control team or a registered building control approver. Both inspect the work and issue the completion certificate.

Full plans or building notice?

A full plans application gets the drawings checked before work starts, which we usually recommend for extensions. A building notice is quicker to submit but carries more risk if something needs changing on site.

Book a free site visit in Kingswood

We will measure up, check the planning position and give you honest guide figures.

  • Free, no-obligation site visit
  • Planning route checked before you spend on drawings
  • Written price once the design is agreed
  • Building control sign-off at the end

Prefer to talk? Call 0800 088 6341 or .

Book a free site visit

Tell us a little about the project and we will arrange a time.

Please enter a valid UK postcode.
Please choose an option.
Please enter your name.
Please enter a phone number.
Please enter a valid email.

We use your details only to reply to this enquiry and prepare your quote. Privacy notice.

Call usGet a quote