Extension plans and drawings across Kingswood
We prepare extension plans and drawings for homes in Kingswood, as a stand-alone service or as the first stage of a design and build project.
- Guide price in KingswoodFrom £1,200 inc VAT
- PlanningWe find the right route for you
- Timescale2–6 weeks for drawings
- Postcode districtsBS15, BS16, BS30

Covering Kingswood
Postcode districts we cover around Kingswood include BS15, BS16, BS30. Nearby, we also take on projects in Mangotsfield (2 miles), Yate (7 miles), Thornbury (10 miles), Dursley (18 miles).
For homes towards Somerset, Keynsham is around 3 miles away. In the South West, local stone, render and brick vary from town to town, so matching materials is a big part of designing an extension that looks right.
Fees in Kingswood
Fees below are our Kingswood guide (×1.02, the South West England factor), including VAT. Council and building control fees are extra.
| Option | What it covers | Guide price |
|---|---|---|
| Essential | Measured survey and planning drawings | £1,200 – £2,250 |
| Standard | Planning drawings plus building regulations drawings | £2,200 – £3,900 |
| Premium | Full pack with structural calculations and 3D visuals | £3,450 – £5,650 |
Want a range for your exact size? The guide-price tool takes about a minute.
Included in a typical project
- Structural calculations from an engineer (full pack)
- Planning drawings: existing and proposed plans and elevations, site and location plans
- 3D views to check the look and the light (full pack)
- Measured survey of the house and garden
- Two or three layout options to compare
The most expensive changes are the ones made after the steel is ordered. A good design stage settles layout, heights, glazing and services on paper, so the build price is firm.
Planning rules that apply in Kingswood
In England the main routes are permitted development (ideally confirmed with a lawful development certificate, £274), larger home extension prior approval (£249, 42 days) and a householder planning application (£548, normally 8 weeks), with council fees as set from 1 April 2026.
Homes in conservation areas, national parks, National Landscapes (formerly AONBs), the Broads and World Heritage Sites have tighter rules, so we always check the property's status and planning history before design starts.
If the work involves a shared wall, building on the boundary, or digging foundations within 3 m (sometimes 6 m) of a neighbour's building, the Party Wall etc. Act 1996 applies and notice must be served before work starts: two months for work to a party wall, one month for new walls on the boundary and for excavations.
Building regulations approval is separate from planning. In England you can use the council's building control team or a registered building control approver; a full plans application gets the drawings checked before work starts, and the inspector signs the work off with a completion certificate.
Applications are decided by the local planning authority (your district, borough or unitary council).
From first visit to completion
Site visits are free and there is no obligation. Where drawings are needed, the design stage is priced in writing before it starts.
Free site visit
A designer visits, takes measurements and photos, and discusses layouts, budget and timing with you.
Design and approvals
We produce the drawings and structural design, and manage the approvals so they are in place before work starts.
Fixed written price
We confirm the build price in writing, based on the approved drawings and the finishes you have chosen.
Build and sign-off
Our team builds the extension, keeps you updated weekly and finishes with building control sign-off.
Questions answered
Do you cover all of Kingswood?
Yes. We cover Kingswood and the surrounding parts of Gloucestershire. Site visits are free and there is no obligation.
Will my neighbours in Kingswood be involved?
If a planning application or prior approval is needed, the council notifies neighbours. If the work is on or near a shared boundary, party wall notices may also be needed.
How long does this take for a Kingswood home?
2–6 weeks for drawings, depending on the council and the complexity of the project.
Do I need an architect?
Not necessarily. For most extensions an experienced designer or architectural technologist is enough. For listed buildings or complex sites an architect’s input can help.
Can I use your drawings with another builder?
Yes. Once paid for, the drawings are yours to use for your project.
Book a free site visit in Kingswood
We will measure up, check the planning position and give you honest guide figures.
- Free, no-obligation site visit
- Planning route checked before you spend on drawings
- Written price once the design is agreed
- Building control sign-off at the end
Prefer to talk? Call 0800 088 6341 or .
Book a free site visit
Tell us a little about the project and we will arrange a time.