Building regulations for extensions across Kempston
For Kempston homeowners we handle building regulations for extensions, with fees agreed in writing before any work starts.
- Guide price in KempstonFrom £950 inc VAT
- Approval routeFull plans or building notice
- Timescale2–5 weeks for drawings
- Postcode districtsMK40, MK42

Fees in Kempston
Guide fees for Kempston including VAT, using our East of England factor of ×1.06. Council and building control charges are not included.
| Option | What it covers | Guide price |
|---|---|---|
| Essential | Building regulations drawings for a simple single-storey extension | £950 – £1,950 |
| Standard | Drawings plus structural calculations | £1,350 – £2,800 |
| Premium | Complex or two-storey pack with energy calculations | £2,300 – £4,050 |
Our design fee only. Building control charges are set by your council (or, in England and Wales, a registered building control approver) and quoted separately.
Try the guide-price tool to see a range for your own size and finish.
Local to Kempston
Our survey diary covers Kempston, including MK40, MK42. Nearby, we also take on projects in Bedford (2 miles), Ampthill (6 miles), Leighton Buzzard (15 miles), Dunstable (16 miles).
Just over the Buckinghamshire border, Milton Keynes is about 12 miles away. Across the East of England many houses sit on generous plots, and single-storey and wraparound extensions are a natural fit.
Included in a typical project
- Submission to the council or a registered building control approver
- Energy and glazing checks, including whole-house calculations if needed
- Inspection bookings throughout the build
- Completion certificate on sign-off
- Structural calculations for beams, lintels and foundations
- Building regulations drawings and written specification
Building regulations approval and planning permission are separate. A design can have planning consent and still need changes to meet the regulations, which is why we draw for both together.
Planning rules that apply in Kempston
Building regulations approval is separate from planning. In England you can use the council's building control team or a registered building control approver; a full plans application gets the drawings checked before work starts, and the inspector signs the work off with a completion certificate.
In a conservation area, national park, National Landscape, the Broads or a World Heritage Site the permitted development limits are tighter (no side or two-storey extensions without an application). Listed homes need listed building consent, and if permitted development rights have been removed, any extension needs an application.
Building over or within 3 m of a public sewer needs the water company's consent, usually through a build-over agreement, before the foundations go in.
If the work involves a shared wall, building on the boundary, or digging foundations within 3 m (sometimes 6 m) of a neighbour's building, the Party Wall etc. Act 1996 applies and notice must be served before work starts: two months for work to a party wall, one month for new walls on the boundary and for excavations.
Applications are decided by the local planning authority (your district, borough or unitary council).
How the project works
Site visits are free and there is no obligation. Where drawings are needed, the design stage is priced in writing before it starts.
Free site visit
We visit your Kempston home, measure up, talk through what you want and check the planning position.
Design and approvals
Drawings are prepared and agreed with you, then submitted for the right planning route and building regulations approval.
Fixed written price
The price is fixed in writing once the design is settled, with a clear programme and payment stages.
Build and sign-off
We build it with one project manager, book the building control inspections and hand over the completion certificate.
Questions answered
Do I need building regulations approval in Kempston?
Yes. Almost every extension needs it, whatever the planning route. We prepare the drawings and book the inspections.
Will my neighbours in Kempston be involved?
If a planning application or prior approval is needed, the council notifies neighbours. If the work is on or near a shared boundary, party wall notices may also be needed.
How long does this take for a Kempston home?
2–5 weeks for drawings, depending on the council and the complexity of the project.
Who are building control?
Either your local council’s building control team or a registered building control approver. Both inspect the work and issue the completion certificate.
What are the insulation standards for an extension?
In England, new walls in an extension should achieve a U-value of 0.18 W/m²K, roofs 0.15 and floors 0.18, with windows at 1.4 and rooflights at 2.2. Wales, Scotland and Northern Ireland set their own figures.
Book a free site visit in Kempston
We will measure up, check the planning position and give you honest guide figures.
- Free, no-obligation site visit
- Planning route checked before you spend on drawings
- Written price once the design is agreed
- Building control sign-off at the end
Prefer to talk? Call 0800 088 6341 or .
Book a free site visit
Tell us a little about the project and we will arrange a time.