house-extension.uk

Building regulations for extensions in Inverurie

We prepare the building warrant for extensions for homes in Inverurie, as a stand-alone service or as the first stage of a design and build project.

  • Guide price in InverurieFrom £850 inc VAT
  • Approval routeBuilding warrant before work starts
  • Timescale2–5 weeks for drawings
  • Postcode districtsAB51
Builder installing a steel beam over a new rear opening on acrow props

Will the council need to approve it?

In Scotland a building warrant from the council is needed before work starts on almost any extension, and a completion certificate is issued when the work is accepted. Building standards are set in the Scottish technical handbooks.

Homes in conservation areas, national scenic areas and listed buildings have tighter rules, so we always check the property's status and planning history before design starts.

Scotland has no Party Wall Act. Where work affects a shared wall or a neighbour's land, we agree access, protection and making good with your neighbour in writing before work starts.

Applications are decided by your council as planning authority.

Local to Inverurie

We cover Inverurie and the postcode districts AB51. Nearby, we also take on projects in Westhill (10 miles), Ellon (13 miles), Aberdeen (15 miles), Stonehaven (23 miles).

Across Scotland, extensions follow Scottish planning and building standards, including the building warrant process, which we build into the programme from the start.

Included in a typical project

  • Building regulations drawings and written specification
  • Energy and glazing checks, including whole-house calculations if needed
  • Inspection bookings throughout the build
  • Completion certificate on sign-off

Building regulations approval and planning permission are separate. A design can have planning consent and still need changes to meet the regulations, which is why we draw for both together.

Fees in Inverurie

Guide fees for Inverurie including VAT, using our Scotland factor of ×0.98. Council and building control charges are not included.

OptionWhat it coversGuide price
EssentialBuilding regulations drawings for a simple single-storey extension£850 – £1,800
StandardDrawings plus structural calculations£1,250 – £2,550
PremiumComplex or two-storey pack with energy calculations£2,150 – £3,750

Our design fee only. Building control charges are set by your council (or, in England and Wales, a registered building control approver) and quoted separately.Council fees are extra and are set by the Scottish Government.

Try the guide-price tool to see a range for your own size and finish.

From first visit to completion

Site visits are free and there is no obligation. Where drawings are needed, the design stage is priced in writing before it starts.

  1. Free site visit

    First, a site visit: we look at the house, garden, access and drains and listen to what you need.

  2. Design and approvals

    We draw the design, agree it with you and handle planning or permitted development checks and building regulations.

  3. Fixed written price

    You receive a written, itemised price and programme. Nothing starts until you are happy with it.

  4. Build and sign-off

    Work is carried out to the agreed programme, inspected by building control and signed off at the end.

Questions answered

Who do I contract with in Inverurie?

Your contract is with S&K Property Investments and Improvement Ltd, which designs and manages the project and the build teams who carry it out.

Do you cover all of Inverurie?

Yes. We cover Inverurie and the surrounding parts of Aberdeen and Aberdeenshire. Site visits are free and there is no obligation.

How long does this take for a Inverurie home?

2–5 weeks for drawings, depending on the council and the complexity of the project.

Book a free site visit in Inverurie

We will measure up, check the planning position and give you honest guide figures.

  • Free, no-obligation site visit
  • Planning route checked before you spend on drawings
  • Written price once the design is agreed
  • Building control sign-off at the end

Prefer to talk? Call 0800 088 6341 or .

Book a free site visit

Tell us a little about the project and we will arrange a time.

Please enter a valid UK postcode.
Please choose an option.
Please enter your name.
Please enter a phone number.
Please enter a valid email.

We use your details only to reply to this enquiry and prepare your quote. Privacy notice.

Call usGet a quote