Building regulations for extensions in Ebbw Vale
Need building regulations for extensions in Ebbw Vale? We survey the house, prepare what the council needs and deal with the officers until a decision is made.
- Guide price in Ebbw ValeFrom £800 inc VAT
- Approval routeFull plans or building notice
- Timescale2–5 weeks for drawings
- Postcode districtsNP22, NP23

Do I need planning permission in Ebbw Vale?
Building regulations approval is separate from planning. Wales has its own building regulations and approved documents; the council or a registered building control approver checks the plans, inspects the work and issues a completion certificate.
In a conservation area, national park, National Landscape or World Heritage Site the permitted development limits are tighter (no side or two-storey extensions without an application). Listed homes need listed building consent, and if permitted development rights have been removed, any extension needs an application.
Building over or within 3 m of a public sewer needs the water company's consent before the foundations go in.
The Party Wall etc. Act 1996 applies in Wales as in England: notice must be served before work to a shared wall, building on the boundary, or excavating close to a neighbour's foundations.
Applications are decided by the local planning authority (your county or county borough council, or the national park authority).
Included in a typical project
- Building regulations drawings and written specification
- Inspection bookings throughout the build
- Energy and glazing checks, including whole-house calculations if needed
- Structural calculations for beams, lintels and foundations
- Submission to the council or a registered building control approver
- Completion certificate on sign-off
What it costs in Ebbw Vale
These are guide fees for Ebbw Vale, adjusted for Wales (×0.93) and including VAT. Council application and inspection fees are paid separately.
| Option | What it covers | Guide price |
|---|---|---|
| Essential | Building regulations drawings for a simple single-storey extension | £800 – £1,700 |
| Standard | Drawings plus structural calculations | £1,200 – £2,450 |
| Premium | Complex or two-storey pack with energy calculations | £2,000 – £3,550 |
Our design fee only. Building control charges are set by your council (or, in England and Wales, a registered building control approver) and quoted separately.Council fees are extra and are set by the Welsh Government.
Try the guide-price tool to see a range for your own size and finish.
Covering Ebbw Vale
We cover Ebbw Vale and the postcode districts NP22, NP23. Neighbouring towns we cover include Pontypool (9 miles), Abergavenny (9 miles), Cwmbran (12 miles), Newport, Gwent (16 miles).
In Wales, terraced houses with rear offshoots are common in the towns, while detached houses and bungalows dominate in rural areas.
Our process, step by step
Site visits are free and there is no obligation. Where drawings are needed, the design stage is priced in writing before it starts.
Free site visit
First, a site visit: we look at the house, garden, access and drains and listen to what you need.
Design and approvals
Drawings are prepared and agreed with you, then submitted for the right planning route and building regulations approval.
Fixed written price
The price is fixed in writing once the design is settled, with a clear programme and payment stages.
Build and sign-off
We build it with one project manager, book the building control inspections and hand over the completion certificate.
Questions answered
Can I see a price before committing to anything?
Yes. The guide prices on this page are adjusted for Ebbw Vale, and the guide-price tool gives a range for your own size. After the survey you get a written price before anything is agreed.
Do I need building regulations approval in Ebbw Vale?
Yes. Almost every extension needs it, whatever the planning route. We prepare the drawings and book the inspections.
Who do I contract with in Ebbw Vale?
Your contract is with S&K Property Investments and Improvement Ltd, which designs and manages the project and the build teams who carry it out.
Who are building control?
Either your local council’s building control team or a registered building control approver. Both inspect the work and issue the completion certificate.
Full plans or building notice?
A full plans application gets the drawings checked before work starts, which we usually recommend for extensions. A building notice is quicker to submit but carries more risk if something needs changing on site.
Book a free site visit in Ebbw Vale
We will measure up, check the planning position and give you honest guide figures.
- Free, no-obligation site visit
- Planning route checked before you spend on drawings
- Written price once the design is agreed
- Building control sign-off at the end
Prefer to talk? Call 0800 088 6341 or .
Book a free site visit
Tell us a little about the project and we will arrange a time.