Building regulations for extensions in East Molesey
For East Molesey homeowners we handle building regulations for extensions, with fees agreed in writing before any work starts.
- Guide price in East MoleseyFrom £1,000 inc VAT
- Approval routeFull plans or building notice
- Timescale2–5 weeks for drawings
- Postcode districtsKT7, KT8

Design and approval fees for East Molesey
These are guide fees for East Molesey, adjusted for South East England (×1.12) and including VAT. Council application and inspection fees are paid separately.
| Option | What it covers | Guide price |
|---|---|---|
| Essential | Building regulations drawings for a simple single-storey extension | £1,000 – £2,050 |
| Standard | Drawings plus structural calculations | £1,450 – £2,950 |
| Premium | Complex or two-storey pack with energy calculations | £2,450 – £4,300 |
Our design fee only. Building control charges are set by your council (or, in England and Wales, a registered building control approver) and quoted separately.
Want a range for your exact size? The guide-price tool takes about a minute.
Extensions in and around East Molesey
Postcode districts we cover around East Molesey include KT7, KT8. Neighbouring towns we cover include West Molesey (1 mile), Esher (2 miles), Walton-on-Thames (3 miles), Sunbury-on-Thames (3 miles).
In the South East, plenty of houses have already been extended once, which makes checking the remaining permitted development allowance an important early step.
When it helps
- Glass-heavy designs that need energy calculations
- Every extension, whatever the planning route
- Homeowners using their own builder who need the drawings
Building regulations approval and planning permission are separate. A design can have planning consent and still need changes to meet the regulations, which is why we draw for both together.
Planning and approvals in East Molesey
Building regulations approval is separate from planning. In England you can use the council's building control team or a registered building control approver; a full plans application gets the drawings checked before work starts, and the inspector signs the work off with a completion certificate.
In a conservation area, national park, National Landscape, the Broads or a World Heritage Site the permitted development limits are tighter (no side or two-storey extensions without an application). Listed homes need listed building consent, and if permitted development rights have been removed, any extension needs an application.
Building over or within 3 m of a public sewer needs the water company's consent, usually through a build-over agreement, before the foundations go in.
Applications are decided by the local planning authority (your district, borough or unitary council).
What happens next
Site visits are free and there is no obligation. Where drawings are needed, the design stage is priced in writing before it starts.
Free site visit
A designer visits, takes measurements and photos, and discusses layouts, budget and timing with you.
Design and approvals
Once the layout is agreed, we deal with the council: planning permission or written confirmation that none is needed, plus building control.
Fixed written price
We confirm the build price in writing, based on the approved drawings and the finishes you have chosen.
Build and sign-off
Our team builds the extension, keeps you updated weekly and finishes with building control sign-off.
Questions answered
How long does this take for a East Molesey home?
2–5 weeks for drawings, depending on the council and the complexity of the project.
Do I need building regulations approval in East Molesey?
Yes. Almost every extension needs it, whatever the planning route. We prepare the drawings and book the inspections.
Will my neighbours in East Molesey be involved?
If a planning application or prior approval is needed, the council notifies neighbours. If the work is on or near a shared boundary, party wall notices may also be needed.
Who are building control?
Either your local council’s building control team or a registered building control approver. Both inspect the work and issue the completion certificate.
What are the insulation standards for an extension?
In England, new walls in an extension should achieve a U-value of 0.18 W/m²K, roofs 0.15 and floors 0.18, with windows at 1.4 and rooflights at 2.2. Wales, Scotland and Northern Ireland set their own figures.
Book a free site visit in East Molesey
We will measure up, check the planning position and give you honest guide figures.
- Free, no-obligation site visit
- Planning route checked before you spend on drawings
- Written price once the design is agreed
- Building control sign-off at the end
Prefer to talk? Call 0800 088 6341 or .
Book a free site visit
Tell us a little about the project and we will arrange a time.