house-extension.uk

Building regulations for extensions in Cambridge

We prepare building regulations for extensions for homes in Cambridge, as a stand-alone service or as the first stage of a design and build project.

  • Guide price in CambridgeFrom £950 inc VAT
  • Approval routeFull plans or building notice
  • Timescale2–5 weeks for drawings
  • Postcode districtsCB1, CB2, CB3, CB4, CB5
Builder installing a steel beam over a new rear opening on acrow props

Design and approval fees for Cambridge

Guide fees for Cambridge including VAT, using our East of England factor of ×1.06. Council and building control charges are not included.

OptionWhat it coversGuide price
EssentialBuilding regulations drawings for a simple single-storey extension£950 – £1,950
StandardDrawings plus structural calculations£1,350 – £2,800
PremiumComplex or two-storey pack with energy calculations£2,300 – £4,050

Our design fee only. Building control charges are set by your council (or, in England and Wales, a registered building control approver) and quoted separately.

Want a range for your exact size? The guide-price tool takes about a minute.

Working in Cambridge

Postcode districts we cover around Cambridge include CB1, CB2, CB3, CB4, CB5, CB22. We also work in nearby Ely (15 miles), Huntingdon (16 miles), St Neots (16 miles), March (24 miles).

Newmarket, in Suffolk, is roughly 13 miles from Cambridge and also on our list. Across the East of England many houses sit on generous plots, and single-storey and wraparound extensions are a natural fit.

Planning and approvals in Cambridge

Building regulations approval is separate from planning. In England you can use the council's building control team or a registered building control approver; a full plans application gets the drawings checked before work starts, and the inspector signs the work off with a completion certificate.

In a conservation area, national park, National Landscape, the Broads or a World Heritage Site the permitted development limits are tighter (no side or two-storey extensions without an application). Listed homes need listed building consent, and if permitted development rights have been removed, any extension needs an application.

Building over or within 3 m of a public sewer needs the water company's consent, usually through a build-over agreement, before the foundations go in.

If the work involves a shared wall, building on the boundary, or digging foundations within 3 m (sometimes 6 m) of a neighbour's building, the Party Wall etc. Act 1996 applies and notice must be served before work starts: two months for work to a party wall, one month for new walls on the boundary and for excavations.

Applications are decided by the local planning authority (your district, borough or unitary council).

Who this service is for

  • Glass-heavy designs that need energy calculations
  • Homeowners using their own builder who need the drawings
  • Every extension, whatever the planning route

Our process, step by step

Site visits are free and there is no obligation. Where drawings are needed, the design stage is priced in writing before it starts.

  1. Free site visit

    A designer visits, takes measurements and photos, and discusses layouts, budget and timing with you.

  2. Design and approvals

    Drawings are prepared and agreed with you, then submitted for the right planning route and building regulations approval.

  3. Fixed written price

    You receive a written, itemised price and programme. Nothing starts until you are happy with it.

  4. Build and sign-off

    Our team builds the extension, keeps you updated weekly and finishes with building control sign-off.

Questions answered

Can I see a price before committing to anything?

Yes. The guide prices on this page are adjusted for Cambridge, and the guide-price tool gives a range for your own size. After the survey you get a written price before anything is agreed.

How long does this take for a Cambridge home?

2–5 weeks for drawings, depending on the council and the complexity of the project.

Who do I contract with in Cambridge?

Your contract is with S&K Property Investments and Improvement Ltd, which designs and manages the project and the build teams who carry it out.

Who are building control?

Either your local council’s building control team or a registered building control approver. Both inspect the work and issue the completion certificate.

What are the insulation standards for an extension?

In England, new walls in an extension should achieve a U-value of 0.18 W/m²K, roofs 0.15 and floors 0.18, with windows at 1.4 and rooflights at 2.2. Wales, Scotland and Northern Ireland set their own figures.

Book a free site visit in Cambridge

We will measure up, check the planning position and give you honest guide figures.

  • Free, no-obligation site visit
  • Planning route checked before you spend on drawings
  • Written price once the design is agreed
  • Building control sign-off at the end

Prefer to talk? Call 0800 088 6341 or .

Book a free site visit

Tell us a little about the project and we will arrange a time.

Please enter a valid UK postcode.
Please choose an option.
Please enter your name.
Please enter a phone number.
Please enter a valid email.

We use your details only to reply to this enquiry and prepare your quote. Privacy notice.

Call usGet a quote