house-extension.uk

Building regulations for extensions in Peterborough

We prepare building regulations for extensions for homes in Peterborough, as a stand-alone service or as the first stage of a design and build project.

  • Guide price in PeterboroughFrom £950 inc VAT
  • Approval routeFull plans or building notice
  • Timescale2–5 weeks for drawings
  • Postcode districtsPE1, PE2, PE3, PE4, PE5
Builder installing a steel beam over a new rear opening on acrow props

What it costs in Peterborough

Guide fees for Peterborough including VAT, using our East of England factor of ×1.06. Council and building control charges are not included.

OptionWhat it coversGuide price
EssentialBuilding regulations drawings for a simple single-storey extension£950 – £1,950
StandardDrawings plus structural calculations£1,350 – £2,800
PremiumComplex or two-storey pack with energy calculations£2,300 – £4,050

Our design fee only. Building control charges are set by your council (or, in England and Wales, a registered building control approver) and quoted separately.

For a figure based on your own dimensions, use our guide-price tool.

Do I need planning permission in Peterborough?

Building regulations approval is separate from planning. In England you can use the council's building control team or a registered building control approver; a full plans application gets the drawings checked before work starts, and the inspector signs the work off with a completion certificate.

Before any drawing is finalised we check whether the house is listed, in a conservation area or subject to an Article 4 direction.

If the work involves a shared wall, building on the boundary, or digging foundations within 3 m (sometimes 6 m) of a neighbour's building, the Party Wall etc. Act 1996 applies and notice must be served before work starts: two months for work to a party wall, one month for new walls on the boundary and for excavations.

Building over or within 3 m of a public sewer needs the water company's consent, usually through a build-over agreement, before the foundations go in.

Applications are decided by the local planning authority (your district, borough or unitary council).

Who this service is for

  • Glass-heavy designs that need energy calculations
  • Homeowners using their own builder who need the drawings
  • Every extension, whatever the planning route

Local to Peterborough

We cover Peterborough and the postcode districts PE1, PE2, PE3, PE4, PE5, PE7. We also work in nearby March (14 miles), Huntingdon (17 miles), Wisbech (18 miles), Ely (25 miles).

The East of England mixes market-town terraces, inter-war semis and modern estates. Clay soils are common in parts of the region, which can affect foundation design.

Our process, step by step

Site visits are free and there is no obligation. Where drawings are needed, the design stage is priced in writing before it starts.

  1. Free site visit

    First, a site visit: we look at the house, garden, access and drains and listen to what you need.

  2. Design and approvals

    We produce the drawings and structural design, and manage the approvals so they are in place before work starts.

  3. Fixed written price

    With the design and specification agreed, you get a fixed written price and a start date.

  4. Build and sign-off

    We build it with one project manager, book the building control inspections and hand over the completion certificate.

Questions answered

Do I need building regulations approval in Peterborough?

Yes. Almost every extension needs it, whatever the planning route. We prepare the drawings and book the inspections.

Who do I contract with in Peterborough?

Your contract is with S&K Property Investments and Improvement Ltd, which designs and manages the project and the build teams who carry it out.

Can I see a price before committing to anything?

Yes. The guide prices on this page are adjusted for Peterborough, and the guide-price tool gives a range for your own size. After the survey you get a written price before anything is agreed.

Who are building control?

Either your local council’s building control team or a registered building control approver. Both inspect the work and issue the completion certificate.

What are the insulation standards for an extension?

In England, new walls in an extension should achieve a U-value of 0.18 W/m²K, roofs 0.15 and floors 0.18, with windows at 1.4 and rooflights at 2.2. Wales, Scotland and Northern Ireland set their own figures.

Book a free site visit in Peterborough

We will measure up, check the planning position and give you honest guide figures.

  • Free, no-obligation site visit
  • Planning route checked before you spend on drawings
  • Written price once the design is agreed
  • Building control sign-off at the end

Prefer to talk? Call 0800 088 6341 or .

Book a free site visit

Tell us a little about the project and we will arrange a time.

Please enter a valid UK postcode.
Please choose an option.
Please enter your name.
Please enter a phone number.
Please enter a valid email.

We use your details only to reply to this enquiry and prepare your quote. Privacy notice.

Call usGet a quote