house-extension.uk

Double-storey extensions in Morecambe

Thinking about a double-storey extension for your Morecambe home? Start with a free site visit: we measure up, check what the council will allow and give you honest guide figures on the day.

  • Guide price in MorecambeFrom £36,000 inc VAT
  • PlanningUsually a householder application
  • Build time16–24 weeks on site
  • Postcode districtsLA1, LA3, LA4
Two-storey rear extension on a brick semi-detached house with a hipped roof

Local to Morecambe

Site visits are available across Morecambe (LA1, LA3, LA4). Neighbouring towns we cover include Lancaster (3 miles), Fleetwood (12 miles), Thornton-Cleveleys (15 miles), Poulton-le-Fylde (17 miles).

For homes towards Cumbria, Ulverston is around 13 miles away. The North West has a high share of Victorian and Edwardian terraces with rear yards and outriggers, plus large areas of inter-war semis in the suburbs.

When a double-storey extension makes sense

  • Homeowners who would otherwise consider moving
  • Houses with enough distance to the rear or side boundary
  • Growing families who need a bedroom as well as a bigger kitchen

How much does a double-storey extension cost in Morecambe?

For Morecambe we adjust our national guide rates by ×0.95, the factor we use for North West England. Figures include VAT; your written quote after the survey replaces them.

Typical rates in Morecambe: £1,470 to £2,850 per m² including VAT, depending on specification.

SizeEssentialStandardPremium
3 m × 4 m, two floors
24 m²
£36,000 – £43,500£41,000 – £54,000£52,000 – £68,500
4 m × 4 m, two floors
32 m²
£47,000 – £56,500£54,500 – £71,500£69,500 – £91,500
4 m × 6 m, two floors
48 m²
£70,500 – £84,500£82,000 – £107,500£104,500 – £137,000

For a figure based on your own dimensions, use our guide-price tool.

Planning rules that apply in Morecambe

In England a two-storey rear extension is permitted development only if it projects no more than 3 m from the original rear wall, sits at least 7 m from the rear boundary, matches the roof pitch and uses obscure, non-opening side windows upstairs. Most two-storey extensions therefore go through a householder planning application, which costs £548 from 1 April 2026 and normally takes about 8 weeks.

Homes in conservation areas, national parks, National Landscapes (formerly AONBs), the Broads and World Heritage Sites have tighter rules, so we always check the property's status and planning history before design starts.

If the work involves a shared wall, building on the boundary, or digging foundations within 3 m (sometimes 6 m) of a neighbour's building, the Party Wall etc. Act 1996 applies and notice must be served before work starts: two months for work to a party wall, one month for new walls on the boundary and for excavations.

Building over or within 3 m of a public sewer needs the water company's consent, usually through a build-over agreement, before the foundations go in.

Applications are decided by the local planning authority (your district, borough or unitary council).

Our process, step by step

Site visits are free and there is no obligation. Where drawings are needed, the design stage is priced in writing before it starts.

  1. Free site visit

    It starts with a visit to your house to measure, check access and talk through ideas and budget.

  2. Design and approvals

    We draw the design, agree it with you and handle planning or permitted development checks and building regulations.

  3. Fixed written price

    The price is fixed in writing once the design is settled, with a clear programme and payment stages.

  4. Build and sign-off

    We build it with one project manager, book the building control inspections and hand over the completion certificate.

Common questions in Morecambe

Do you cover all of Morecambe?

Yes. We cover Morecambe and the surrounding parts of Lancashire. Site visits are free and there is no obligation.

How long does a double-storey extension take to build in Morecambe?

On site, typically 16 to 24 weeks once approvals are in place. Before that, allow 8–16 weeks design and approvals.

Will my neighbours in Morecambe be involved?

If a planning application or prior approval is needed, the council notifies neighbours. If the work is on or near a shared boundary, party wall notices may also be needed.

Does a double-storey extension need planning permission?

Often, yes. In England a two-storey rear extension can be permitted development only if it projects no more than 3 m and sits at least 7 m from the rear boundary, with matching roof pitch and obscure side windows. Side extensions over one storey always need planning permission. We confirm the route at the survey.

Do I need a Party Wall Agreement?

If you are in England or Wales and the work involves a shared wall or digging foundations close to a neighbour, the Party Wall etc. Act 1996 applies and notices must be served before work starts. We tell you which notices are needed.

Book a free site visit in Morecambe

We will measure up, check the planning position and give you honest guide figures.

  • Free, no-obligation site visit
  • Planning route checked before you spend on drawings
  • Written price once the design is agreed
  • Building control sign-off at the end

Prefer to talk? Call 0800 088 6341 or .

Book a free site visit

Tell us a little about the project and we will arrange a time.

Please enter a valid UK postcode.
Please choose an option.
Please enter your name.
Please enter a phone number.
Please enter a valid email.

We use your details only to reply to this enquiry and prepare your quote. Privacy notice.

Call usGet a quote