Double-storey extensions in Durham: design, approvals and build
From the first sketch to final sign-off, we plan and build double-storey extensions in Durham and the surrounding County Durham area.
- Guide price in DurhamFrom £34,500 inc VAT
- PlanningUsually a householder application
- Build time16–24 weeks on site
- Postcode districtsDH1

Is a double-storey extension right for your house?
- Homeowners who would otherwise consider moving
- Growing families who need a bedroom as well as a bigger kitchen
- Houses with enough distance to the rear or side boundary
The roof is what makes a two-storey extension look right or wrong. We match the pitch and materials of the main house wherever possible and plan the upstairs layout around the existing landing so the new rooms feel original rather than bolted on.
Local to Durham
We cover Durham and the postcode districts DH1. Neighbouring towns we cover include Chester-le-Street (6 miles), Stanley (8 miles), Bishop Auckland (9 miles), Peterlee (10 miles).
Just over the Tyne and Wear border, Houghton-le-Spring is about 6 miles away. Across the North East, houses often have rear yards or modest gardens, so compact, well-lit single-storey extensions make the biggest difference.
How much does a double-storey extension cost in Durham?
Labour and material costs vary across the UK, so for Durham we use our North East England factor (×0.91). The ranges include VAT and exclude design, structural and council fees.
Typical rates in Durham: £1,410 to £2,730 per m² including VAT, depending on specification.
| Size | Essential | Standard | Premium |
|---|---|---|---|
| 3 m × 4 m, two floors 24 m² | £34,500 – £41,500 | £39,000 – £51,500 | £50,000 – £66,000 |
| 4 m × 4 m, two floors 32 m² | £45,000 – £54,000 | £52,000 – £68,500 | £66,500 – £87,500 |
| 4 m × 6 m, two floors 48 m² | £67,500 – £81,000 | £78,500 – £103,000 | £100,000 – £131,500 |
Try the guide-price tool to see a range for your own size and finish.
Planning and approvals in Durham
In England a two-storey rear extension is permitted development only if it projects no more than 3 m from the original rear wall, sits at least 7 m from the rear boundary, matches the roof pitch and uses obscure, non-opening side windows upstairs. Most two-storey extensions therefore go through a householder planning application, which costs £548 from 1 April 2026 and normally takes about 8 weeks.
Before any drawing is finalised we check whether the house is listed, in a conservation area or subject to an Article 4 direction.
Building over or within 3 m of a public sewer needs the water company's consent, usually through a build-over agreement, before the foundations go in.
If the work involves a shared wall, building on the boundary, or digging foundations within 3 m (sometimes 6 m) of a neighbour's building, the Party Wall etc. Act 1996 applies and notice must be served before work starts: two months for work to a party wall, one month for new walls on the boundary and for excavations.
Applications are decided by the local planning authority (your district, borough or unitary council).
What happens next
Site visits are free and there is no obligation. Where drawings are needed, the design stage is priced in writing before it starts.
Free site visit
First, a site visit: we look at the house, garden, access and drains and listen to what you need.
Design and approvals
We draw the design, agree it with you and handle planning or permitted development checks and building regulations.
Fixed written price
The price is fixed in writing once the design is settled, with a clear programme and payment stages.
Build and sign-off
We build it with one project manager, book the building control inspections and hand over the completion certificate.
Questions people ask about double-storey extensions
How long does a double-storey extension take to build in Durham?
On site, typically 16 to 24 weeks once approvals are in place. Before that, allow 8–16 weeks design and approvals.
Can I see a price before committing to anything?
Yes. The guide prices on this page are adjusted for Durham, and the guide-price tool gives a range for your own size. After the survey you get a written price before anything is agreed.
Do I need building regulations approval in Durham?
Yes. Almost every extension needs it, whatever the planning route. We prepare the drawings and book the inspections.
Does a double-storey extension need planning permission?
Often, yes. In England a two-storey rear extension can be permitted development only if it projects no more than 3 m and sits at least 7 m from the rear boundary, with matching roof pitch and obscure side windows. Side extensions over one storey always need planning permission. We confirm the route at the survey.
Do I need a Party Wall Agreement?
If you are in England or Wales and the work involves a shared wall or digging foundations close to a neighbour, the Party Wall etc. Act 1996 applies and notices must be served before work starts. We tell you which notices are needed.
Book a free site visit in Durham
We will measure up, check the planning position and give you honest guide figures.
- Free, no-obligation site visit
- Planning route checked before you spend on drawings
- Written price once the design is agreed
- Building control sign-off at the end