Double-storey extensions across Bishop Auckland
A double-storey extension in Bishop Auckland starts with the right design and the right approval route. We take care of both, then build it with our own project management.
- Guide price in Bishop AucklandFrom £34,500 inc VAT
- PlanningUsually a householder application
- Build time16–24 weeks on site
- Postcode districtsDL4, DL14

What should I budget for a double-storey extension in Bishop Auckland?
For Bishop Auckland we adjust our national guide rates by ×0.91, the factor we use for North East England. Figures include VAT; your written quote after the survey replaces them.
Typical rates in Bishop Auckland: £1,410 to £2,730 per m² including VAT, depending on specification.
| Size | Essential | Standard | Premium |
|---|---|---|---|
| 3 m × 4 m, two floors 24 m² | £34,500 – £41,500 | £39,000 – £51,500 | £50,000 – £66,000 |
| 4 m × 4 m, two floors 32 m² | £45,000 – £54,000 | £52,000 – £68,500 | £66,500 – £87,500 |
| 4 m × 6 m, two floors 48 m² | £67,500 – £81,000 | £78,500 – £103,000 | £100,000 – £131,500 |
Try the guide-price tool to see a range for your own size and finish.
Planning and approvals in Bishop Auckland
In England a two-storey rear extension is permitted development only if it projects no more than 3 m from the original rear wall, sits at least 7 m from the rear boundary, matches the roof pitch and uses obscure, non-opening side windows upstairs. Most two-storey extensions therefore go through a householder planning application, which costs £548 from 1 April 2026 and normally takes about 8 weeks.
Homes in conservation areas, national parks, National Landscapes (formerly AONBs), the Broads and World Heritage Sites have tighter rules, so we always check the property's status and planning history before design starts.
If the work involves a shared wall, building on the boundary, or digging foundations within 3 m (sometimes 6 m) of a neighbour's building, the Party Wall etc. Act 1996 applies and notice must be served before work starts: two months for work to a party wall, one month for new walls on the boundary and for excavations.
Building over or within 3 m of a public sewer needs the water company's consent, usually through a build-over agreement, before the foundations go in.
Applications are decided by the local planning authority (your district, borough or unitary council).
Extensions in and around Bishop Auckland
Across DL4, DL14, we can visit, measure and advise. Nearby, we also take on projects in Newton Aycliffe (5 miles), Durham (9 miles), Darlington (10 miles), Chester-le-Street (15 miles).
Just over the Tyne and Wear border, Houghton-le-Spring is about 15 miles away. Across the North East, houses often have rear yards or modest gardens, so compact, well-lit single-storey extensions make the biggest difference.
When a double-storey extension makes sense
- Houses with enough distance to the rear or side boundary
- Homeowners who would otherwise consider moving
- Growing families who need a bedroom as well as a bigger kitchen
The roof is what makes a two-storey extension look right or wrong. We match the pitch and materials of the main house wherever possible and plan the upstairs layout around the existing landing so the new rooms feel original rather than bolted on.
Our process, step by step
Site visits are free and there is no obligation. Where drawings are needed, the design stage is priced in writing before it starts.
Free site visit
It starts with a visit to your house to measure, check access and talk through ideas and budget.
Design and approvals
Drawings are prepared and agreed with you, then submitted for the right planning route and building regulations approval.
Fixed written price
You receive a written, itemised price and programme. Nothing starts until you are happy with it.
Build and sign-off
We build it with one project manager, book the building control inspections and hand over the completion certificate.
Your questions about a double-storey extension in Bishop Auckland
Who do I contract with for a double-storey extension in Bishop Auckland?
Your contract is with S&K Property Investments and Improvement Ltd, which designs and manages the project and the build teams who carry it out.
Can I see a price before committing to anything?
Yes. The guide prices on this page are adjusted for Bishop Auckland, and the guide-price tool gives a range for your own size. After the survey you get a written price before anything is agreed.
Will my neighbours in Bishop Auckland be involved?
If a planning application or prior approval is needed, the council notifies neighbours. If the work is on or near a shared boundary, party wall notices may also be needed.
Is a two-storey extension cheaper per square metre?
Usually. Our guide range is about £1,410 to £2,730 per m² of new floor area including VAT, compared with £1,590 to £3,090 per m² for single-storey work, because the foundations and roof are shared across two floors.
Do I need a Party Wall Agreement?
If you are in England or Wales and the work involves a shared wall or digging foundations close to a neighbour, the Party Wall etc. Act 1996 applies and notices must be served before work starts. We tell you which notices are needed.
Book a free site visit in Bishop Auckland
We will measure up, check the planning position and give you honest guide figures.
- Free, no-obligation site visit
- Planning route checked before you spend on drawings
- Written price once the design is agreed
- Building control sign-off at the end