house-extension.uk

Extension plans and drawings in Dunoon

Dunoon projects are quoted by arrangement: we plan the design, approvals and build carefully around travel and material deliveries, and confirm any travel costs up front.

  • Guide price in DunoonFrom £1,150 inc VAT
  • PlanningWe find the right route for you
  • Timescale2–6 weeks for drawings
  • Postcode districtsPA23
Extension floor plans and elevations with a scale ruler and laser measure

What it costs in Dunoon

Guide fees for Dunoon including VAT, using our Scotland factor of ×0.98. Council and building control charges are not included.

OptionWhat it coversGuide price
EssentialMeasured survey and planning drawings£1,150 – £2,200
StandardPlanning drawings plus building regulations drawings£2,150 – £3,750
PremiumFull pack with structural calculations and 3D visuals£3,300 – £5,400

Try the guide-price tool to see a range for your own size and finish.

Planning rules that apply in Dunoon

In Scotland the questions are whether the extension falls within householder permitted development (Classes 1A to 1D) or needs planning permission from the council, and the building warrant, which is required before construction begins and is followed by a completion certificate.

Homes in conservation areas, national scenic areas and listed buildings have tighter rules, so we always check the property's status and planning history before design starts.

Scotland has no Party Wall Act. Where work affects a shared wall or a neighbour's land, we agree access, protection and making good with your neighbour in writing before work starts.

Building close to a public sewer needs the agreement of Scottish Water, which we check during design.

Applications are decided by your council as planning authority.

Covering Dunoon

Across PA23, we can visit, measure and advise. Island and remote projects are planned individually, with travel, deliveries and accommodation for the team agreed before the survey.

Across Scotland, extensions follow Scottish planning and building standards, including the building warrant process, which we build into the programme from the start.

When it helps

  • Projects that need a planning application or other approval
  • Homeowners at the very start of a project
  • Anyone who wants fixed designs before getting build prices

The most expensive changes are the ones made after the steel is ordered. A good design stage settles layout, heights, glazing and services on paper, so the build price is firm.

Our process, step by step

Visits to Dunoon are arranged around travel; we confirm any travel costs in writing before the survey.

  1. Site visit by arrangement

    A designer visits, takes measurements and photos, and discusses layouts, budget and timing with you.

  2. Design and approvals

    Drawings are prepared and agreed with you, then submitted for the right planning route and building regulations approval.

  3. Fixed written price

    You receive a written, itemised price and programme. Nothing starts until you are happy with it.

  4. Build and sign-off

    We build it with one project manager, book the building control inspections and hand over the completion certificate.

Questions answered

Who do I contract with in Dunoon?

Your contract is with S&K Property Investments and Improvement Ltd, which designs and manages the project and the build teams who carry it out.

How long does this take for a Dunoon home?

2–6 weeks for drawings, depending on the council and the complexity of the project.

Do you cover all of Dunoon?

Yes. We cover Dunoon and the surrounding parts of Argyll and Bute. Projects here are taken on by arrangement because of travel, and any travel costs are agreed before the survey.

Do I need an architect?

Not necessarily. For most extensions an experienced designer or architectural technologist is enough. For listed buildings or complex sites an architect’s input can help.

How much do extension plans cost?

Our design packs range from about £1,150 to £5,400 including VAT, from planning drawings only to a full pack with building regulations drawings, structural calculations and 3D views. Council fees are separate.

Talk to us about a project in Dunoon

We will talk through the project, the planning position and how we would organise the visit and the build.

  • Site visit arranged around travel, costs agreed first
  • Planning route checked before you spend on drawings
  • Written price once the design is agreed
  • Building control sign-off at the end

Prefer to talk? Call 0800 088 6341 or .

Send us your project details

Tell us a little about the project and we will arrange a time.

Please enter a valid UK postcode.
Please choose an option.
Please enter your name.
Please enter a phone number.
Please enter a valid email.

We use your details only to reply to this enquiry and prepare your quote. Privacy notice.

Call usGet a quote